The complex is formed by the cubic volumes creating difficult geometrical drawing on facades with a continuous and angular glazing: vertical and horizontal strips of light and dark shades. Seven-section perimeter building with an internal square includes inhabited floors, office rooms, a basement floor with parking and a technical floor.
Awards: Bronze diploma of the international festival “Zodchestvo 2011”
Project Team: S. Oreshkin – Project leader A. Weiner – main engineer of the project R. Andreeva, A. Nikandrov - main architects of the project O. Legkova- architect