XX Wands by Studio für Architektur – Peter Haimerl

Peter Haimerl as Architects

Heightening of the multi-story car park „Salvatorplatz 3“ Task The appraisal of the facade of summer 2004 intended the development of a façade concept for the planned heightening of the multi-story car park at “Salvatorplatz” in Munich.


In the context of the reconstruction of an office and garage building the multi-storey car park has been increased by 2 ½ floors. In the view of the historical surrounding and the inventory building , which stands under single monument and under monument protection and lies in embraced of an ensemble range, the organization of the new façade has been of great importance. The multi-storey car park is situated in the midst of the old town of Munich. Leavings of the former medieval city wall and parts of the “Jungfernturm” of 1430 directly border the multi-storey car park. The existing multi-storey car park of Franz Hart (1964/65) is oriented on the materiality of the former city wall. The exposed lying brick wall has been absorbed and resumed.


Solution The new steel façade structure of Peter Haimerl made of galvanized steel has been developed through computer generated expirations, which generate new order samples. A netlike network has been invented on the basis of staffs with the width of the thin formatted brick used at the inventory building and a constant staff length of 1,5 m.


The façade surrounds the heightening like a volume and creates a transparent covering for the new parking decks. The density of the structure decreases from down upward. As a result of the transparency of the structure and the gene constantness of the material the existing solidium remains untouched.


Innovation The production of the façade of galvanized steel plates through computer-controlled plasma cut equipment corresponds to the idea of direct use of computer generated data. This means a direct transition of the draft data to machine production without the use of hand drawings of the designing architect.


Construction The inventory buildings are of reinforced concrete skeletons, disguised with clinker brick-work The heightening of the multi-story car park is a structural steel work with reinforced concrete composite floors. The steel plates of the façade with the height of 8,50m and the width of 2,50m are fastened at the structural steelwork of the parking deck.


Text:Studio für Architektur

Project Spotlight
Product Spotlight
News
Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
29 Apr 2024 News
Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds

Designed by Zaha Hadid Architects, the Zhuhai Jinwan Civic Art Centre is defined by the acclaimed ar... More

25 best metal cladding manufacturers
29 Apr 2024 Specification
25 best metal cladding manufacturers

Metal cladding can combine functionality with aesthetics while meeting high sustainability targets,... More

Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations
29 Apr 2024 News
Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations

Nieto Sobejano Arquitectos has completed the restoration and expansion of the Archaeologische Staats... More

Introducing Partner Lemi Group
29 Apr 2024 Partner News
Introducing Partner Lemi Group

Lemi Group is an international leader in the design and manufacture of treatment tables, chairs, and... More

Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More