Torre Copisa
Nelson Ben

Torre Copisa

UTIFIRVE S.L. as Engineers

It has a surface area of over 7000 m2 and has involved an investment of 25 million euros for the construction agency GRUPO COPISA, where the different group companies will be located. The new building has 13 floors, eleven of which will be offices and the other two, both underground, house their own car park with a total of 91 spaces, a document archive, a restaurant / cafeteria for personnel, training and meeting rooms and a conference hall for some 100 people.


TORRE COPISA,


Inverted tower


The 45.70-metre-high TORRE COPISA is a work by Catalan architect Oscar Tusquets, who describes the new headquarters as ‘an inverted tower, an upside-down ziggurat, relatively small compared to its neighbours, although with an important presence among the set of edifices in Plaza de Europa’.


TORRE COPISA completes the hub of the new economic district in Hospitalet de Llobregat, along with the Ciudad de la Justicia and the new access to the Fira de Barcelona. The area is replete with gardens, a wide range of facilities, shopping centres and prestigious hotels.


When designing the new headquarters, the architect centred on obtaining the maximum surface area in the top part of the tower. In the architect’s own words ‘we studied a building with a square ground floor with the maximum occupation at the top, which progressively decreased in area, eroded at the corners as you continue downwards until reaching a minimum area at the bottom. The glass corners become increasingly larger closer to the ground as they receive less light’.


A sustainable vision


TORRE COPISA has been designed by taking sustainability and energy savings into consideration in accord with the environmental responsibility policy of the COPISA GROUP. In this regard, the new building utilises an air conditioning system in which the air is renewed on each of the diaphanous floors.


With respect to the façade of the new building, part of it is ventilated, blending opaque areas with glass in order to reduce energy consumption during both cold and hot weather. Furthermore, as the glassed areas are larger at the bottom region of the building, more light and more protection is obtained with regard to harnessing temperatures.


Natural light is also very present throughout the first underground floor and the car park, where two courtyards have been constructed with natural and transverse ventilation, thus allowing for the entry of natural light and a decrease in lighting costs during the day. Moreover, the building has been equipped with a potable hot-water production system that leads to a significant drop in water consumption in the restaurant / cafeteria and in personnel services and toilets.


ARCHITECTURAL PROJECT: ARCHITECT OSCAR TUSQUETS BLANCA VENTILATED FAÇADE STRUCTURAL PROJECT: UTIFIRVE S.L.


TOTAL COVERED SURFACE AREA: 2000 m2 APPLIED CLADDING: PEARL GRAY GRANITE


SYSTEM USED: JAMA 166


WORK: COPISA


Project Credits
Products used in this project
Product Spec Sheet

Project Spotlight
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More