Huis de Wiers Story by Jaco D. de Visser Architecten Huis de Wiers Residence de Wiers Story by Architectenweb Magazine Residence de Wiers

Residence de Wiers

Architectenweb Magazine as Media

The De Wiers house is a free reinterpretation of the original house that was built in 1654 as outdoor space in Vreeswijk. Around 1900 the house was used as shipyard, whereby the yard was excavated and functioned as a dock. Later on the De Wiers house was nearly completely demolished. In 1996 only the basement remained of this rich historic property. Architectural office Jaco D. de Visser took the lead and developed a post modern concept for the restoration of the remaining parts of the building and a contemporary outside area.


It is surprising that the current De Wiers house approaches the initial form of the historic building. At this point the restoration work ends and the new housing estate begins. The original house had three stories. Now a building of 5 levels arises from the basement. Due to the increased load of the additional layers the whole structure cannot entirely be constructed out of stone on the existing foundations. To reduce the load the frames, the facades and the roof are made out of wood. The use also deviates from the original. The typology of the warehouse is sufficient for the architect to replace the original function of outdoor space.


It is interesting to question whether or not the objectives of the project have been achieved. The objective was “To avoid the remainders of this unique monument being forgotten or even disappearing completely.” Although the conceptual basis of Jaco De Visser seems as stretchy as elastic, the architecture surprises by showing a consistent and carefully detailed, archetypical sculpture. But if the result can be described as “a contemporary outside place with the greatness of what the De Wiers residence ever was”, we still have to see.

Huis de Wiers

Jaco D. de Visser Architecten as Architects

The original Huis de Wiers [The Wiers House] was built in 1654 and was known as the ‘northern sentinel of Vreeswijk’. A point of recognition, a beacon, an outpost of Vreeswijk. It remained so until the industrial revolution took place around 1900. In those years a shipyard was established on the spot where Huis de Wiers stood. The grounds around the house were hollowed out into a harbour basin, a slipway and storage yards. The house itself was drastically changed and was later demolished almost entirely. The only reminder about the rich history of yesteryear was the remaining lower ground floor.


In order to prevent the remains of this unique monument from falling into obscurity, or even disappearing completely, JDdVarchitects has taken the initiative to develop a concept for the restoration of the remaining sections, which, in combination with a new structure, will form a new contemporary country estate: Huis de Wiers in the year 2000. Present-day architecture with a patina of the past.


Restoration and Building The concept consists of two sections. The restoration of the existing lower ground level and the realisation of a structure in the contours of the historical envelope. The result: a contemporary ‘manor house’ with all the grandeur of what Huis de Wiers ever was. By applying the same materials to the roof as well as to the façades, a sculptural volume comes about, which provides the possibility for installing the opening for daylight ingression as storey-high sliding doors, in a neutral and ‘at random’ fashion. In the open position, these function as an external area in the form of a loggia.


Elevated ground floor with lower ground floor These two levels are intended for a café restaurant of a high culinary standard. The combination with a beautifully laid out garden, a terrace on the south-western side with a view of the inland shipping and the adjacent yachting harbour, contributes to a setting which titillates all the senses.


Workshops as office space The upperlying storeys have a clear structure with a number of fundamental facilities for every conceivable comfort and are positioned as such, that all the floors can be used in a multiple of ways. Obviously there's a lift to take you to every desired level. The bearing structure ensures there is a major degree of flexibility in the floor plan. The level of finishings have been selected as such, that it conjures up an image of an industrial monument. The freshly sawn timber bearing structure with posts, and the rotary floating concrete floors with black pigment, provide an image which smacks of a labour-intensive past. Thus areas are created with an industrial atmosphere, which can be divided up according to the user's wishes, and which can be provided with all the amenities conceivable in the forthcoming decades.


Layout of the external area The surrounding grounds will be restored. The former canal will be paved along its ‘shelf’; the forecourt will be provided with plants and greenery with an historical character by means of formal rows of trees, hedges and a gravel surfacing; the gateway with stables will be restored and on the western side, a sun-drenched garden with terrace will be constructed. There will be ample parking facilities which will be integrated as such, that it will be concealed from view as much as possible. A project such as that described above, by definition, is just the kind of job for our company. Many years' worth of experience have, amongst other things, led to a professional approach, with knowledge and expertise pertaining to restoration, revitalisation, new construction, cost control and a development strategy in conformity with the market.

Project Spotlight
Product Spotlight
News
25 best metal cladding manufacturers
29 Apr 2024 Specification
25 best metal cladding manufacturers

Metal cladding can combine functionality with aesthetics while meeting high sustainability targets,... More

Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations
29 Apr 2024 News
Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations

Nieto Sobejano Arquitectos has completed the restoration and expansion of the Archaeologische Staats... More

Introducing Partner Lemi Group
29 Apr 2024 Partner News
Introducing Partner Lemi Group

Lemi Group is an international leader in the design and manufacture of treatment tables, chairs, and... More

Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More