O FIEIRO HOUSE
Alfonso Quiroga

O FIEIRO HOUSE

Arturo Franco as Architects

The village of O Fieiro is located in the natural environment of Mount Pindo, known as the Celtic Olympus, a granite rock formation from which all the traditional Galician houses in the area emerge.

photo_credit Alfonso Quiroga
Alfonso Quiroga

The project considers the rehabilitation of a small animal stable, a 1920 farmhouse built with stone walls of large, well-arranged granite ashlars, 70-80 cm thick, with a two-sloped roof made of fibre cement sheeting on a prestressed concrete joist structure.The original farmhouse had an access corridor located in the centre, separating two spaces, In one of them was the stable for the cattle, while in the other there was a kitchen with a stone oven and a niche where the sink was placed, under the window. This space led to an upper floor, now demolished, through a stone staircase, where the bedrooms were situated.

photo_credit Alfonso Quiroga
Alfonso Quiroga

Adjacent to the house, to the northeast, there is a single-storey stone attached volume, with a two-sloped roof, which contained a storehouse. On the southwest side there is another volume integrated in the main volume with two floors over ground level. The second floor had been also demolished and used as a storehouse too. None of these volumes was connected to each other from the inside, each one having its own access from the outside.

photo_credit Alfonso Quiroga
Alfonso Quiroga

The intervention to rehabilitate the stable and transform it into a home is based on the general concept of taking advantage of its system of load-bearing walls that work by compression and using it as a container and support for a new structure of wooden slabs working by traction.The constructive and structural system is resolved with three materials, wood, steel and truck straps, in collaboration with the original stone.

photo_credit Alfonso Quiroga
Alfonso Quiroga

Firstly, mechinal openings are made in the masonry walls at different heights into which three metal section sleepers are inserted. The pinewood slabs are then embedded in the masonry wall over the metal sleepers and fixed in place with wooden wedges.The slabs bridge a distance up to 5.20 meters between supports. The planks are loose, without gluing or tongue. To give them stability, there are tie-down straps that wrap them, these are fixed on the vertical stone walls by means of an anchoring system with stainless steel rings, making the whole system work by traction.

photo_credit Alfonso Quiroga
Alfonso Quiroga

Secondly, the original roof of prestressed concrete joists and fibre cement sheeting has been preserved, a second fibre cement sheeting roof supported by metal purlins has been installed on top, to generate a ventilated roof. In the west area, the original roof has been demolished to open a terrace on the upper floor and thus take advantage of natural light from this orientation.The entire structure remains visible, including a protection on the lower face of the roof made of solid pine slats supported on the wing of the concrete beam. All exterior and interior carpentry, which were in poor condition or non-existent, have been replaced by new metal carpentry.And all the interior stone divisions have been preserved, repairing the walls and adding new openings to connect the spaces with each other. In addition, other unique stone elements have been preserved, such as the stairs, the fireplace, the sink, and a font.  

photo_credit Alfonso Quiroga
Alfonso Quiroga

The house has been built around two main spaces in double and triple height, visually connected to each other in all their diagonals and in constant relationship with the outside. Inside them the programme associated with the day is developed, such as eating, cooking, meeting, working, playing, socializing, relaxing, etc. The bedrooms are located in the integrated volume placed in the west zone, in a more private area. Finally, in the adjacent volume on the northeast, an additional bedroom has been situated, which is independent from the main house.To connect the vertical spaces, the original stairs have been conserved, with steps formed by large stones that offload their weight onto the ground.As an antagonist, a new metal sheet staircase has been designed that seems to levitate on the wooden floor.The old stable has thus become a house that is experienced as a natural topography. A cave inhabited by little savages in an unconventional way. As in the forest, in nature, on Mount Pindo, one has to move looking at the ground, and upwards, alert, with caution. A sustainable house like village houses, without technological impostures.

Caption
Caption

Material Used :
1. Construction company: Manuel Barreiro Castro
2. Timber store: Maderas Rado S.L.
3. Carpenter: Priegue S.L.
4. Locksmith: Talleres Lado S.L.

Project Credits
Product Spec Sheet

ElementBrand
Timber supplierMaderas Rado S.L.
Product Spec Sheet
Timber supplier
Project Spotlight
Product Spotlight
News
Archello houses of the month - April 2024
30 Apr 2024 News
Archello houses of the month - April 2024

Archello has selected its houses of the month for April 2024. This list showcases 20 of the mos... More

Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
29 Apr 2024 News
Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds

Designed by Zaha Hadid Architects, the Zhuhai Jinwan Civic Art Centre is defined by the acclaimed ar... More

25 best metal cladding manufacturers
29 Apr 2024 Specification
25 best metal cladding manufacturers

Metal cladding can combine functionality with aesthetics while meeting high sustainability targets,... More

Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations
29 Apr 2024 News
Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations

Nieto Sobejano Arquitectos has completed the restoration and expansion of the Archaeologische Staats... More

Introducing Partner Lemi Group
29 Apr 2024 Partner News
Introducing Partner Lemi Group

Lemi Group is an international leader in the design and manufacture of treatment tables, chairs, and... More

Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More