250 sun shades for pilgrims in Medina

SEFAR as Manufacturers

Project.


Each year,millions of pilgrims flock to the mosque in Medina alMunawwarah. In recent years, the traditional time of pilgrimage has been in the cooler fall and winter months. This time frame is changing gradually, however. According to the lunar calendar, the time of pilgrimage is returning to the extremely hot summer months, making a sunshade absolutely essential.


Concept/Design. As general contractor, the Saudi Binladin Group contracted the architectonic planning of this project to SL-Rasch GmbH in Leinfelden-Echterdingen (Germany). It was clear from the beginning that only PTFE fabric would be able to meet the exceptional situational demands. Other materials would not provide full protection from the aggressive UV radiation or satisfy the stringent standards required by the customer. In addition to UV-stability, the material had to have an extremely high tensile strength owing to wind load, maximum flexibility, colorfastness, fire resistance, as well as effective shading and appropriate light transmission. The extra tough PTFE fabric developed by Sefar especially for this huge project could not remain pure white owing to the intensity of the light since the strong transmission would have blinded people beneath the sunshade. For this reason, the customer chose a sandcolored fabric. In addition, oriental patterns made from blue PTFE-ribbons should be applied to the underside of the umbrella. With careful adjustment of the weaving machine, the consistent quality of the giant fabric surface was also guaranteed.


Construction. Since September 2010, a total of 250 umbrellas, each one with a surface area of 25.5 x 25.5 m (when open) and 15 meters high, have been installed in the area surrounding the mosque in Medina al-Munawwarah. These umbrellas work together to form a shaded area of 143’000 m2 – greater than the floor area of the mosque itself. When closed, each umbrella – including its working parts – is encased in a narrow, elegant column. The opening and closing procedure only takes three minutes. The outcome of this combination: by shading with PTFE fabric, the ambient temperature is reduced by at least 8 °C.

Project Credits
Manufacturers
Contractors
Product Spec Sheet

ElementBrand
ManufacturersSEFAR
ManufacturersLiebherr
ManufacturersTaiyo Kogyo
Product Spec Sheet
Manufacturers
by SEFAR
Manufacturers
Manufacturers
Products Behind Projects
Product Spotlight
News
25 best metal cladding manufacturers
29 Apr 2024 Specification
25 best metal cladding manufacturers

Metal cladding can combine functionality with aesthetics while meeting high sustainability targets,... More

Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations
29 Apr 2024 News
Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations

Nieto Sobejano Arquitectos has completed the restoration and expansion of the Archaeologische Staats... More

Introducing Partner Lemi Group
29 Apr 2024 Partner News
Introducing Partner Lemi Group

Lemi Group is an international leader in the design and manufacture of treatment tables, chairs, and... More

Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More