Kindergarten
Juliusz Sokołowski and Wojciech Bęczarski

Kindergarten

toprojekt as Architects

Pre-school education is one of the most important stages in human development, so we should carefully care for the quality of space in which this process takes place. Children cannot be underestimated and serve only colored interiors. A child is a serious, sensitive recipient who puts the highest demands on the designer.


A five-branch kindergarten was established in the center of Kleszczówka district in the suburbs of Żory. The immediate environment is dominated by chaotic single-family buildings. A little further you can meet small clusters of four blocks. In this environment, the kindergarten is the space and new quality.


A small parcel of an irregular shape similar to a triangle intended for the construction of a pre-school segment at an existing school, imposed rather two-story solutions, although a little overwhelming, but leaving a little space for the playground. Instead, we decided to have a one-story building with rounded corners, which filled almost all of the possible surface, and for the outdoor play, we designed a large roof terrace.


To provide access to daylight to all rooms and communication spaces, we put a rectangular atrium into the center of the kindergarten, a piece of the outside world into which snow and rainfall and constantly changing sunlight.


Openwork, steel stairs can get from the atrium to the roof. A streamlined, wood-covered terrace with two circular islands of green in the middle encourages children to run on more and more tracks. Outside the terrace, the roof surface is covered with ornamental grasses. It is a pity that during the construction it was not possible to keep old acacias at the border of the plot, which would partly shade the terrace. You will have to wait for a few years for new trees.


A triangle with rounded corners and irregular perforation of concrete walls. The mineral wool enabled precise warming of the vertical planks. The wall line remains fluid.


Reinforced concrete walls work with heat exchanger and heating systems. Mineral wool protects during the summer. Moisture, which could trace in the thermal insulation layer, is discharged to the outside. This slit has a different effect on overheating. Wool as a completely non-flammable material reduces the fire risk to a minimum.


Reinforced concrete walls work perfectly with a ground heat exchanger and heating and ventilation systems, constituting an excellent heat and cold compensator. Mineral wool protects the building from the loss of energy outside and its excessive acquisition during the summer.


The cladding of the vertical boards has also been covered with external walls. The walls and roof will naturally grow old, the trees grow and the grass will thicken. The functioning and aging of a building in the perspective of years is also for us - and perhaps even more - important from its appearance at the time of putting into use.


A streamlined, wood-covered terrace with three circular islands. Outside the terrace, the roof surface is covered with ornamental grasses. It is not possible to keep the old building, which would be some of the shades of the terrace. You will have to wait for a few years for new trees. The project has received numerous awards and is nominated for EU Mies award 2019.

Project Credits
Architects
Product Spec Sheet

ElementBrand
Building insulationROCKWOOL International A/S
Roofing systemBORNIT
Product Spec Sheet
Building insulation
Roofing system
by BORNIT
Products Behind Projects
Product Spotlight
News
C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid
6 May 2024 News
C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid

Danish architectural firms C.F. Møller Architects and EFFEKT feature in Archello’s 25 b... More

25 best architecture firms in Denmark
3 May 2024 News
25 best architecture firms in Denmark

Danish architecture is defined by three terms – innovative, people-centric, and vibrant. Traci... More

Key projects by OMA
3 May 2024 News
Key projects by OMA

OMA is an internationally renowned architecture and urbanism practice led by eight partner... More

10 homes making use of straw bale construction and insulation
2 May 2024 Specification
10 homes making use of straw bale construction and insulation

Straw has a long history as a building material, finding application in thatch roofs, as a binding a... More

ATP architects engineers completes office building in line with “New Work” principles and sustainability goals
2 May 2024 News
ATP architects engineers completes office building in line with “New Work” principles and sustainability goals

ATP architects engineers has completed a sustainable operational and office building for Austrian ma... More

SOM completes “terminal in a garden” at Bengaluru’s Kempegowda International Airport
1 May 2024 News
SOM completes “terminal in a garden” at Bengaluru’s Kempegowda International Airport

International and interdisciplinary architecture, design, and engineering firm Skidmore, Owings &... More

Archello houses of the month - April 2024
30 Apr 2024 News
Archello houses of the month - April 2024

Archello has selected its houses of the month for April 2024. This list showcases 20 of the mos... More

Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds
29 Apr 2024 News
Zaha Hadid Architects’ Zhuhai Jinwan Civic Art Centre echoes chevron patterns of migratory birds

Designed by Zaha Hadid Architects, the Zhuhai Jinwan Civic Art Centre is defined by the acclaimed ar... More