The Christoph Merian Foundation (CMS) sought to consolidate the various departments currently housed at their headquarters in Basel’s historic old town. This was to be achieved by moving into a new building that would replace the former dental clinic on a site in the grounds behind the property at St. Alban-Vorstadt 12. An innovative timber structure over three floors would provide a state-of-the-art working environment in keeping with today’s requirements of open communication and flexible teamwork.

photo_credit © Herzog & de Meuron
© Herzog & de Meuron
photo_credit © Herzog & de Meuron
© Herzog & de Meuron

In 2018, the client commissioned Herzog & de Meuron to undertake a study outlining various ways of going beyond the spatial configuration of the building, with the express wish of making an urban planning, architectural and cultural contribution to the city’s development. Having explored a number of options for refurbishment of the existing building, it was eventually decided that the best way forward would be to design a replacement building.

photo_credit © Herzog & de Meuron
© Herzog & de Meuron
photo_credit © Herzog & de Meuron
© Herzog & de Meuron

Situated between the Münsterhügel and the former outer city wall with its gateway of St. Alban-Tor, the area known as St. Alban-Vorstadt represents one of Basel’s first early medieval expansions and has largely retained its historic character. In 2017, the Christoph Merian Foundation moved its headquarters to a neoclassical building dating from 1865 at St. Alban-Vorstadt 12, where two buildings in the rear courtyard were occupied, respectively, by the dental clinic and the Vorstadt Theater.

photo_credit © Herzog & de Meuron
© Herzog & de Meuron
photo_credit © Herzog & de Meuron
© Herzog & de Meuron

St. Alban-Vorstadt is located within a designated conservation area and, as such, is subject to certain legislation aimed at protecting Basel’s historic monuments and architectural heritage in accordance with the city’s prevailing Building and Planning Law. The courtyard site behind St. Alban-Vorstadt 12 is directly adjacent to the new wing of the Basel Kunstmuseum, the former Vorstadt Theater and the former church by Otto Rudolf Salvisberg, built in 1936, which is now used as a rehearsal space by the Basel Symphony Orchestra.

photo_credit © Herzog & de Meuron
© Herzog & de Meuron
photo_credit © Herzog & de Meuron
© Herzog & de Meuron

With its three-story, pitched-roof design reflecting the original proportions of the historic 19th century building stock prior to any 20th century additions, the new-build helps to rectify the urban development situation within the conservation area. In contrast to the structurally determined small-space layout of the refurbishment option, which was rejected, the new-build provides a main area of 36m by 6m on two of the three floors, which can be configured freely according to the spatial requirements and flexible usage concepts of the Christoph Merian Foundation. The ground floor is divided by the entrance area.

photo_credit © Herzog & de Meuron
© Herzog & de Meuron
photo_credit © Herzog & de Meuron
© Herzog & de Meuron

The basement houses the archives and the building’s technical services. All the other rooms for ancillary and technical services, as well as the straight stairway and elevator, are aligned along the rear firewall. The fully glazed façade with projecting arcades looking onto the courtyard lends expression to the wide-reaching openness of the Foundation in its social, cultural, and ecological endeavours.

photo_credit © Herzog & de Meuron
© Herzog & de Meuron
photo_credit © Herzog & de Meuron
© Herzog & de Meuron

Apart from the basement and the structurally enhanced steel-reinforced concrete firewall, the building is designed as a sustainable timber structure. As such, it references the historically prevalent wooden courtyard outbuildings of the area. The wooden-concrete-composite ceilings that span the entire 10m depth of the building are made of spruce and silver fir, while high-quality beech is used for the load-bearing columns and edge beams. The projecting arcades are supported by wooden brackets, allowing structural penetration of the façade.

Inside the building, the wooden floorboards of the arcades continue in the form of large parquet planks. The underside of the ceiling reveals the different heights of the individual wooden boards. In conjunction with the unclad wooden lathes along the back wall, this creates the perfect acoustics to ensure a comfortable working environment in such an open-plan space.

Caption
Caption

Team:

Client: Christoph Merian Stiftung, Basel, Schweiz

Architects: Herzog & de Meuron

Partners: Jacques Herzog, Pierre de Meuron, Andreas Fries (Partner in Charge), Christoph Röttinger (Coupling Partner)

Project Team: Elena Klinnert (Project Manager, Senior Architect), Martin Krapp (Project Director, Associate)

Michael Bär (Associate), Massimo Corradi (Design Technologies), Jonas Läufer, Tom Mundy, Niklas Nalbach, Martin Schulte (Design Technologies), Joyce Schwyn, Klelia Siska, Julius Zucco

Project and Construction Management: Dietziker Partner Baumanagement AG

Structural Engineering: Schnetzer Puskas Ingenieure AG

Project Architect: Herzog & de Meuron Basel Ltd.

Facade Consulting: Christoph Etter Fassadenplanung

Landscape Design: Stauffenegger + Partner AG

Building Services Consulting: Kalt + Halbeisen Ingenieurbüro AG

Building Physics Consulting: Kopitsis Bauphysik AG

Fire Protection Engineering: A. Aegerter & Dr. O. Bosshardt AG

Photographer: Daisuke Hirabayashi

Caption
Caption

Read story in Deutsch

Products Behind Projects
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More