Guthrie Pavilion
Copyright T.R. Hamzah & Yeang Sdn. Bhd. (2012)

Guthrie Pavilion

Hamzah & Yeang as Architects

This is a 3-storey building with offices on one wing and a golf clubhouse on the other wing. The offices are the HQ peremises for Guthrie Property Development Holding Sdn. Bhd. (GPDH) [ a division of Kumpulan Guthre Berhad]. The company's business is solely in real estate development. The building is intended to be a landmark building and to be the most prestigious building visible from the highway as visitors enter the locality.


The building comprises of 4 major parts: • The Offices (West Wing) - Accommodating Guthrie subsidiary offices. • The Golf Clubhouse (East Wing) - Housing a public Golf Clubhouse with changing rooms, Pro-Shop and Caddy station on the Ground Floor. The Golfer's cafeteria, Golfers Terrace and Restaurant have views towards the golf course. • The Core- Holding the common services for both wings ie. toilets, prayer rooms and M&E plant room, riser ducts and chiller plant. • The Roof - is an independent structure, acting as an "umbrella" over the building. The roof shields the building from the sun, reducing glare and air-conditioning load whilst providing a usable roof terrace overlooking the golf course on the north and east. Sunshades are located along the east and west faces of the buidling to reduce heat again.


The building is fully glazed for maximum views out and natural lighting.


• The pavilion below the canopy has a reinforced concrete structural frame with glass and panel infill. • The canopy structure is of pre-tensioned cable and pylon steel masts supporting an inflated pillow and canopy. Its primary purpose is to create a physical presence to the locality and to signify its importance as a landmark. The canopy also serves as a second roof over the roof terrace to the pavilion below, offering shading while reducing solar radiation within the building, resulting in 66,283 kw/hr savings in energy consumption per annum.


The structural system • The roofing system is formed by 2 air-inflated membrane cushions, which are connected at their border to a tubular steel frame. The frame is supported in the interior by a steel skeleton.


• The cushion with the elongated shape is called cushion 1, whilest trapezoidal form is cushion 2. Both cushions are supported by hanger cables towards the tops of three tubular steel masts and by vertical stressing cables to the ground or at some places to the building. The cushions are connected to each other by four members. The portion between the 2 cushions is covered by three conical shaped single-layer membrane structures.


• The structure extends to about 110m maximum length and 51m maximum width. The overall height of the masts is about 40m. The level of the membrane cushions is about 15 to 20 m above ground level. The roof covers in total 2,700 sq.m.

Project Spotlight
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More