Product Spec Sheet

ElementBrandProduct Name
Bamboo for plantersMOSO Bamboo Products
Aluminium (annodised) curtain wallSCHÜCO
Wooden facade systemCARPENTIER HARDWOOD SOLUTIONS
Concrete stairsHibex
Moss wallMoswand
PlantersNoordhof Interieurbouw

Product Spec Sheet
Bamboo for planters
Aluminium (annodised) curtain wall
by SCHÜCO
Wooden facade system
Concrete stairs
by Hibex
Moss wall
by Moswand

Groningen UWV renovation | interior design

rudy uytenhaak + partners architecten as Architects

Commissioned by Schroders Capital, RU+PA designed a new entrance for the existing office building of the UWV in Groningen. A new volume was added under the colonnade at the location of the current entrance, in which a direct staircase provides a clear and inviting connection to the front desk on the second floor. By creating its own, well-lit world under a colonnade, the visibility of the new entrance is increased.

Located between the station and the bus square, the long-stretched building that houses UWV consists of a shading of four office wings with public functions on the first floor facing the bus square. The wings are connected by a structure of pergolas and colonnades which acts as an important pedestrian route towards the various bus platforms. Hidden under one of the colonnades is the main entrance to the building and tenant UWV.

photo_credit RU+PA
RU+PA

A new volume was added under the colonnade that protrudes from the existing facade to increase the visibility of UWV's main entrance. The corners of the volume are rounded to maintain a smooth passage of pedestrians under the colonnade. The volume consists primarily of glass to maximize daylight entry and increase social safety in the area. The facade follows the contour of the stairs, below which a wooden slatted wall is created where the entrance to the Arriva office is located. Once inside, a staircase leads visitors to the reception area on the second floor. Visitors with reduced mobility can use the existing elevator.

A world of its own was created by using modern contrasting materials for the facades and continuing the base color on adjacent facade and ceiling as well. The aluminum window frames and thermally modified softwood slats are low-maintenance and age beautifully.   

photo_credit RU+PA
RU+PA

In the interior, visitors are guided on one side by a wooden slatted wall with line lighting that extends along the staircase up through on the ceiling and on the other side by bamboo troughs with various plantings on the stand steps. The stairs, made of concrete with grass granules, consist of block steps with inset steps. A nuance difference between the different types of steps has been made by choosing a different finish of the concrete, so that the degree of glass differs for each step. 

The new entrance has a modern and warm appearance, provides more visibility on the outside and a clear inviting entrance for visitors on the inside.

photo_credit RU+PA
RU+PA

Team:

Architect: rudy uytenhaak +partners architecten

Client: Schroders Capital, Amsterdam

Project Manager: Draaijer en partners

Construction Engineer: Pieters Bouwtechniek

General Contractor: Notebomers Bouwgroep

Caption

Materials Used:

Schuco: Aluminium (annodised) curtain wall

Carpentier: Wooden facade system

Moso: Bamboo for planters

Noordhof Interieurbouw: Planters

Hibex: Concrete stairs

Moswand.eu: Moss wall

Caption
Caption
Caption

Read story in Nederlands

Project Spotlight
Product Spotlight
News
25 best metal cladding manufacturers
29 Apr 2024 Specification
25 best metal cladding manufacturers

Metal cladding can combine functionality with aesthetics while meeting high sustainability targets,... More

Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations
29 Apr 2024 News
Nieto Sobejano Arquitectos’ restoration of Munich museum finds freedom within limitations

Nieto Sobejano Arquitectos has completed the restoration and expansion of the Archaeologische Staats... More

Introducing Partner Lemi Group
29 Apr 2024 Partner News
Introducing Partner Lemi Group

Lemi Group is an international leader in the design and manufacture of treatment tables, chairs, and... More

Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More