Fonamental – Transformación de Plaza Mallorca
José Hevia

Fonamental – Transformación de Plaza Mallorca

Son Estudi as Architects

This is a project for the transformation of an existing public space. The intervention enhances existing qualities and elements through its use and enables the place as an infrastructure for future lives.

The plaza is located in a key situation of articulation between the historic center and different urban fabrics, marked by both pedestrian and vehicular traffic flows that cross and surround it. Based on several problems, the city council of Inca convened in 2016 an open competition for its refurbishment.

photo_credit José Hevia
José Hevia

"Fonamentalésunaproposta que parteixdelsfonaments de la plaça". The underground physically conditions the plaza due to the presence of two parking floors. One of them emerges on the surface, causing the plaza to be divided longitudinally by a 4-meter high wall, some service spaces and high skylights. This set produced a barrier effect, both between the different levels of public space and between the relationships of people in the place.

photo_credit José Hevia
José Hevia

The project acts at the intersection between levels, not only to improve the integration of the different spaces of the plaza and its surroundings, but also to sow, nurture and articulate new possibilities for the future of this public space. Where the wall used to divide, there is now a new artificial topography for interaction (bleachers). Where people used to cross in the dark at night or under the sun in summer, now there is shade, vegetation and lighting at night for strolling. (pergola). Where there was no activity, now there is a new space that gives life to the plaza (local).

photo_credit José Hevia
José Hevia

The set of bleachers + pergola + local is designed in an interconnected way, transcending the concreteness of the elements that compose it and overcoming its immediate or separate uses. The set crosses longitudinally the plaza and is designed as an expandable system. This involves combining multiple criteria; constructive, programmatic, monumental, everyday, environmental and life cycle of the whole.

photo_credit José Hevia
José Hevia

The main constructive strategy is based on the geometric reorganization of the plaza, taking as a base the structure of pillars and waffle slab of the subway parking lot, thus coordinating the geometric and structural logic of the whole. In addition to the constructive argument of continuity between new and old structures, the fact of aligning sets a clear criterion for future growth of the current configuration. This reinforces the possibility of the support system extending throughout the plaza. In this way, the public space responds to a renewed order that affects the infrastructural vocation of the project, aligning construction and concept.

photo_credit José Hevia
José Hevia

We understand that a public space is one that is capable of enabling a multitude of activities and situations by making the most of existing resources. From the infrastructural understanding of the project, the refurbishment of Plaza Mallorca in Inca transforms an existing public space and takes advantage of its potential to provide it with new present and future capabilities.

Team:
Architects in Charge: Gerardo Pérez de Amezaga Tomás y Pau Villalonga Munar
Technical architect: TomeuRamon
Client: Ayuntamiento de Inca
Engineering: Jordi Grimalt
Builder: Obras MAN

photo_credit José Hevia
José Hevia
photo_credit José Hevia
José Hevia
Caption
Caption
Caption

Read story in Español and Português

Project Credits
Product Spec Sheet

Products Behind Projects
Product Spotlight
News
25 best architecture firms in Iran
12 Jun 2024 News
25 best architecture firms in Iran

Iran is an arid and rugged country in Southwest Asia, home to a rich and diverse culture spanning mi... More

Pelli Clarke & Partners completes Salesforce Tower Chicago as part of riverfront master plan
11 Jun 2024 News
Pelli Clarke & Partners completes Salesforce Tower Chicago as part of riverfront master plan

Pelli Clarke & Partners has completed the Salesforce Tower Chicago, a LEED Gold-certified office... More

Official opening of the Serpentine Pavilion 2024
11 Jun 2024 News
Serpentine Pavilion 2024 officially opens

The new Serpentine Pavilion was officially opened on June 7 in London. This 23rd edition of the annu... More

Teğet designs visitor center for Neolithic Çatalhöyük archeological site
10 Jun 2024 News
Teğet designs visitor center for Neolithic Çatalhöyük archeological site

Istanbul-based Teğet Architecture has designed a visitor center for Çatalhöyük, a h... More

Wonder Bridge by SPF:a: Vital transportation link stands as a symbol of innovation and artistic expression
9 Jun 2024 News
Wonder Bridge by SPF:a: Vital transportation link stands as a symbol of innovation and artistic expression

Spanning a busy highway in Paso Robles, California, Wonder Bridge by acclaimed architecture firm SPF... More

Key recent projects by MVRDV
7 Jun 2024 News
Key recent projects by MVRDV

MVRDV is a global architecture studio established in 1993 by Winy Maas, Jacob van Rijs, and Nathalie... More

Enrico Molteni Architecture completes a timber and glass inclusive education center in Parma
6 Jun 2024 News
Enrico Molteni Architecture completes a timber and glass inclusive education center in Parma

Milan-based Enrico Molteni Architecture has completed the development of an inclusive education cent... More

CLOU architects realizes Hangzhou kindergarten as series of stacked building blocks
5 Jun 2024 News
CLOU architects realizes Hangzhou kindergarten as series of stacked building blocks

Beijing-based CLOU architects, an internationally-focused design studio, has completed the West Coas... More