The main reason of the decision to choose this products was the experience of the architect in the past during execution of Barajas Airport renovation where 30BD was integrated on frames producing a tile system. Then, due to confidence, the new design was a copy of Barajas renovation.
Because of budget reasons, the frames were removed just before execution and the product was saved by double the length of the panels including a profile between sections in the open spaces of the Terminal.
The experience of the architect in Madrid, find a technical and aesthetic solution with the material once the frames were removed, the possibility to customize two interior colors + a solid partner in the area were the main points to get the order.
Competitors were all local and exterior able to produce a similar material but the position of the architect was a key point to defend the specified material.