Chołdzyński

An overview of projects, products and exclusive articles about chołdzyński

Project • By Piotr Krajewski - Architectural PhotographyOffices

Nowy Świat 2.0 in Warsaw

Photo shoot of the Nowy Świat 2.0 office building in Warsaw for architectural studio, AMC – Andrzej M. Chołdzyński. Information on the possibilities of use the photographs: [email protected] or +48 / 606463444 Nowy Świat 2.0 office and services building, located between the former headquarters of the Polish Communist Party House (now: The Banking and Financial Center office building) and Warsaw Stock Exchange buildings, adjoins a nineteenth-century tenement house. The five floors represent more than 4100 sq. meters of office and ca. 2000 sq. meters of retail space. The ground floor, the mezzanine and -1 level are occupied by retail stores. On the top level there is a terrace with a view on Three Crosses Square and The Na Książęcem Par... More

Project • By Piotr Krajewski - Architectural PhotographyUniversities

Centre for Innovation and Advanced Technologies in Lublin

The Center for Innovation and Advanced Technologies (CIiZT) is located at the eastern boundary of the Lublin University of Technology in the immediate vicinity of the buildings of the Faculty of Mechanical Engineering, Rectorate and Library. The building is located on the land that falls in the south-east direction and the differences in the levels are about 8,20 m. The CIiZT building adjoins the southern part of the B31 Cultural Landscape Preservation Area, which is a cultural park, including the remains of the former Jesuit farm. The Innovation Center was designed following the pattern of an "industrial hotel" of the Enlightenment and Industrial Revolution - building on a rectangular layout measuring 100x50m and of five storeys. The cre... More

Project • By Piotr Krajewski - Architectural PhotographySubway Stations

Warsaw Metro Second Line (M2)

The second line of the Warszawa metro opened on March 8.The 6·5 km east-west route links Rondo Daszyńskiego and Warszawa Wileńska with seven stations and includes an 870 m tunnel under the Wisła River. Line 2 intersects with the north-south Line 1 at Świętokryzska, and interchanges are also provided with main line rail services at Stadion Narodowy and Wileńska. The end-to-end journey time is around 10 min, and services run every 3 min. The construction contract was signed in October 2009 by a consortium of Astaldi, Gülermak and Przedsiębiorstwo Budowy Dróg i Mostów, which created the special purpose company AGP Metro. Total cost of construction and rolling stock was 5·9bn złoty, which included an EU contribution of 3·1bn złoty. Civi... More