The project, realised in a 1,600 m2 site donated to AIDOS by Ouagadougou’s Municipal Government, is based on the separation of the primary activities performed by the CBF into two distinct, though closely related buildings: a Training Centre dedicated to activities of awareness-building and the administration and management of the CBF and a Consultancy Centre, used for medical visits, legal assistance and psychological counselling.


The initial design was developed prior to the definition of the project site and at a time when the office possessed very little technical information about locally available technologies and materials. As a consequence the early stages of the project were approached as a ‘work in progress’: a typological model with some clearly defined architectonic characteristics derived from climatic, environmental, technical and economic considerations and flexible and adaptable to any possible site.


The two main buildings are set atop a single structural element: a raised platform creates a true artificial plane that supports various buildings used for different purposes. The raising of the platform above the ground ensures hygienic/climatic conditions that are extraneous to local culture and practices of building [protection against dust, mud and humidity]. The two main buildings are protected against rainfall and, above all, direct sunshine, by a lightweight waterproof recyclable PVC velarium supported by an independent structure of steel 'trees'. This sloping tarpaulin is part of a system that collects and stores rainwater to irrigate the garden.


The volumes that contain the various rooms are independent of the roof structure and freely placed atop the platform and articulated around a series of shaded and ventilated patios that ensure privacy from the exterior. The modular configuration of the structure allows for future expansion, while preserving the general framework of the building. The building walls are constructed using compressed dry stacked BTC [briques en terre comprimée] clay bricks made on site using a rough mixture of earth, cement and water. The making of these sun-baked bricks consumed no additional energy, limiting the environmental impact of the entire intervention.


The choice to use site-formed mud bricks was based on their temperature and humidity reduction characteristics, enhanced here by their protection against contact with water, perhaps the only serious limitation they pose. The use of this technology represents the desire to introduce alternative and sustainable technologies within a context that is tied to standardised, though not always optimal building practices and the widespread importation of foreign materials.


The buildings are covered by corrugated aluminium and translucent decking that allows natural light to filter into the interior, reducing the need for artificial illumination.


The space between the steel roof and the velarium and the open cavity beneath the platform, together with the exterior openings fitted with operable glass fins, all help to improve the natural ventilation of interior spaces and drastically reduce the need for mechanical air conditioning.


The exterior space, similar to the interior, is designed as an open area to be used by the entire community. It is a space of sharing and of information used to present the themes dealt with by the CBF. Indirect and informal communication is also favoured by the organisation of small events and public discussions. The garden is a micro environment that surrounds the structure and takes advantage of the shade provided by the building and trees and the humidity produced by the plants. A grass layer reduces the effects of erosion, while various species from Western and Sub-Saharan Africa have been planted with the twofold intention of creating shade and promoting the return of autochthonous vegetation.


Temperature control, perhaps the most significant climatic issue, has strongly influenced the overall design. The adopted strategy also includes: • carefully studied [beneficial] building orientation that reduces the effects of hot wind and takes advantage of mutual over shading • the shading of heavy material against direct exposure to the sun • the extensive use of operable windows • the use of transitional spaces, such as verandas or patios to separate enclosed areas. Given the lack of water and power in the area, the Centre is fully independent. Integrated systems for the systematic control of energy consumption are accompanied by energy self-production, using largely renewable resources, water is provided by a newly drilled and dedicated well and photovoltaic cells have been installed along the perimeter wall, reducing the use of the electrical generator. These simple steps affect both personal behaviour and collective responsibility: the elimination of mechanical air conditioning [limited to medical rooms in order to assure filtered air] is perhaps the project’s most important achievement in terms of environmental sustainability.


The outside walls, devoid of any openings, are finished in brightly painted plaster. The local NGO’s slogan, translated into 5 languages, completes the decoration of the walls, turning the entire building into a large canvas that broadcasts the structure’s social objectives in an informal manner. Internal finishes, such as the colourful mosaic tiling, have been realised with the aim of combining a pleasing appearance with ease of construction, using locally available materials in a different and playful way.


The CBF is the first ‘real’ building to be constructed in Sector 27, one of the poorest suburbs in Ouagadougou, Burkina Faso. This semi-rural area is defined by a multitude of small, spontaneously constructed mud huts and entirely devoid of any planning regulations or basic infrastructures. Since its completion the CBF has become a focal point for the rapid development of a wide range of new activities. Moreover, the strong architectural identity of the new building has rendered the neighbourhood interesting and attractive to local authorities, the international media and, as a consequence, possible donors and social operators. The first direct effects of the suburb’s newly acquired visibility can be seen in the Municipality’s decision to build a new road; the creation of electrical and water supply connections; the construction of a new maternity clinic and the donation of a once empty field to women living in Sector 27 for use as an income generating self-cultivated vegetable garden.


Project Credits
Architects
Product Spec Sheet

Products Behind Projects
Product Spotlight
News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert
18 Mar 2024 News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert

Mumbai-based Sanjay Puri Architects has completed the Nokha Village Community Centre, an architectur... More

Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024
15 Mar 2024 News
Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024

In this Archello series, we look at each of the seven nominated projects (five architecture finalist... More

25 best mosaic wall tile manufacturers
15 Mar 2024 Specification
25 best mosaic wall tile manufacturers

Mosaic wall tiles are produced in an enormous range of colors, shapes and finishes, and from a varie... More

Introducing Partner Motion Facades
15 Mar 2024 Partner News
Introducing Partner Motion Facades

Motion Facades specializes in supplying advanced facade systems for luxury real estate projects. Its... More

Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel
15 Mar 2024 Archello Awards
Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel

Architects Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores have been an... More

JSWD completes new office complex in Bonn unified by triangular facade elements
14 Mar 2024 News
JSWD completes new office complex in Bonn unified by triangular facade elements

International architectural firm JSWD has completed the Neuer Kanzlerplatz office complex in the cit... More

Archello Awards 2024 expands with 'Firm Awards'
14 Mar 2024 Archello Awards
Archello Awards 2024 expands with 'Firm Awards'

Today Archello introduces a new set of Firm Awards categories to widen the scope of the Archello Awa... More

Studio Egret West develops plans for new Passivhaus homes
13 Mar 2024 News
Studio Egret West develops plans for new Passivhaus homes

London-based multidisciplinary architecture and design practice Studio Egret West has developed plan... More