Archello Awards 2024 open for entry · Early Bird gets 25% off
Archello Awards 2024 open for entry
Early Bird gets 25% off
Tribune Zouthaven

Tribune Zouthaven

Studio Prototype as Architects

Market consultation


In the start of 2014 the municipality of Amsterdam has granted Studio Prototype, resulting from a market consultation, the assignment for realizing a tribune staircase in the Zouthaven in Amsterdam. For the small-scale assignment, a special way of tendering was chosen: design & build. Thus Studio Prototype is not only responsible for the design-, but is also the main executer of the build process.


As the client, the municipality of Amsterdam has strived within this special process for maximal quality within a strictly predetermined budget.


Zouthaven


The Zouthaven in Amsterdam has the potential to grow into being a public link from which tourists from the cruise terminal find their way, along the bottom of the bridge, to the center. Part of this link is the new tribune/stairs. The concept of studio Prototype starts with a triangular shape, which guides the tourists in a natural way. Spots to reside are provided by the tribune on both sides of the (functional) stairs. One spot is oriented at the sun and the other at the water and view.


On a detailed level the steps and timber seating elements are subtly interwoven. Bellinga timber parts used as seating elements vary from the profiled aluminum parts for the stairs. The tribune stairs does not stand out because of its expressive shape, or its materialization, but because of its simplicity. Thus it is one with its surroundings and creates extra value for the future use of the place.


Design & build


From the design & build principal, the accepter of an assignment is responsible for the complete building process: from the first sketches and the concept to the completion of the last screw of the project. The client thus spreads the risks better than in a traditional process and in the mean time this kind of tendering decreases the building time.


The new responsibility ensures that the accepter of the assignment should carefully organize the design and build process. By involving suppliers and subcontractors in the design phase, an integral exchange of knowledge occurs in an early stage. In this way risks are further decreased, complex execution aspects are better engineered and a more efficient and a shorter building process comes into being. By organizing responsibilities in a different way within the building process, the capability of the designer to aim for quality is increased. From this responsibility for the whole process, the designer is capable of contracting parties and to select on prize in relation to quality while doing so.


Project Spotlight
Product Spotlight
News
25 best aluminum window manufacturers
13 May 2024 Specification
25 best aluminum window manufacturers

Aluminum windows and window systems are lightweight, corrosion-resistant, and structurally strong. S... More

Detail: Red facade and triangular plot create distinctive apartment building in Barcelona
10 May 2024 Detail
Detail: Red facade and triangular plot create distinctive apartment building in Barcelona

Barcelona-based architectural studios MIAS Architects and Coll-Leclerc have completed the developmen... More

Snøhetta completes Norway’s first naturally climatized mixed-use building
8 May 2024 News
Snøhetta completes Norway’s first naturally climatized mixed-use building

Global transdisciplinary architecture and design practice Snøhetta has completed Norway&rsquo... More

Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp
8 May 2024 News
Studioninedots designs “Octavia Hill” on intricate site in new Hyde Park district, Hoofddorp

Amsterdam-based architecture and urban design practice Studioninedots has designed a building as par... More

Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space
8 May 2024 News
Waterworks Food Hall promises Toronto a new landmark cultural destination within a beautiful heritage space

Opening this June, Waterworks Food Hall promises a new multi-faceted dining experience and landmark... More

Wood Marsh emphasizes color and form in new Melbourne rail stations
7 May 2024 News
Wood Marsh emphasizes color and form in new Melbourne rail stations

Melbourne-based architectural studio Wood Marsh has completed the development of Bell and Preston ra... More

C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid
6 May 2024 News
C.F. Møller Architects and EFFEKT design new maritime academy based on a modular construction grid

Danish architectural firms C.F. Møller Architects and EFFEKT feature in Archello’s 25 b... More

25 best architecture firms in Denmark
3 May 2024 News
25 best architecture firms in Denmark

Danish architecture is defined by three terms – innovative, people-centric, and vibrant. Traci... More