PAD completed the fit-out of International Superyacht Company Green Marine in April 2011. Commissioned in November 2010 PAD completed Feasibility Design, Design Development and full Construction drawings in only 8 weeks. Construction took a further 9 weeks and was delivered within the target budget.
The new entrance to Green Marine is cut into the existing 1920's industrial shed located within Hythe Marine Park. A dramatic new staircase and reception area with polished resin floor evoke watery images whilst being robust. A bespoke oak reception desk and oak lined observation window demonstrate PAD's attention to detail and allow visitors and clients to view the shop floor during discussions.
The new project managers’ office is separated from the entrance area by a dividing wall that allows views through via a long slot window. Suspended ceiling were removed to allow a greater sense of space.