RESEARCH CENTER ICTA-ICP · UAB

RESEARCH CENTER ICTA-ICP · UAB

HARQUITECTES as Architects

The ICTA-ICP building, located in the UAB Campus (Universitat Autònoma de Barcelona), is a research centre in environmental sciences and palaeontology. In accordance with the research fields of the building users, they chose, from the beginning, a building prepared to give an ambitious response to the challenges of sustainability. The building, an isolated volume of five floors of 40x40m2 and two basements, contains the following program: on the ground floor the hall, bar, classrooms, meeting rooms and the administration area; the next 3 floors hold the offices and laboratories; on the roof there are vegetable patches together with the resting areas. The semi basement holds the parking and the engine rooms while the basement contains the warehouses and other laboratories. Both offices and laboratories are spaces with a lot of internal load and therefore tend to be hot. The building has been designed to take profit from this internal situation in winter while it tends to dissipate it in summer. It has been thought as an adaptable and flexible infrastructure able to suffer changes of use, developing several simultaneous strategies that work complementarily.


Structure A long life and low cost concrete structure with a lot of inertia has been chosen as the main structure, contributing directly to the passive comfort of the building. The quantity of concrete has been optimized distributing its mass in favour of the thermal exchange. It uses a post-stressed concrete slabs with pipes in the central area where the air circulates, in order to build a lighter structure. At the top and bottom of the slab the thermal mass is activated by geothermal energy.


Skin The concrete structure is wrapped and protected by a low cost exterior bioclimatic skin. By installing a greenhouse industrialized system that opens and closes its mechanisms automatically, the solar gain and ventilation are regulated. This way, it is possible to raise the interior temperature naturally and guarantee a base of comfort in the circulation spaces as well as in the in-between spaces.


Patios In the middle of the building four patios, with stairs that connect the different levels at certain points, guarantee light and ventilation in all workspaces reducing the consumption of artificial lighting. These patios, as well as the inbetween spaces and the perimeter gallery, contain several plant species that allow to improve the comfort through the adjustment of the humidity gradient.


Basements The building also takes advantage of the contact of the two basements with the terrain to pre-acclimatize the air renovations of the building through two air chambers: one generated by “PI” beams that make up the retaining walls and the other, the air chamber underneath the basement floor.


Wooden boxes Inside this improved climate there are well-insulated wooden boxes, with practicable glass openings that help to achieve the comfort conditions of the workspaces. The distribution of these boxes is different on each floor depending on the needs of each user creating generous and indeterminate interstitial spaces. These spaces link with the circulations generating more informal meeting and resting areas.


Climate and management The building has been designed to host three types of climates associated with different intensities of use: Climate A: in-between spaces, that are exclusively acclimatized/heated by passive and bioclimatic systems; Climate B: offices, that combine natural ventilation with radiant and semi-passive systems; Climate C: laboratories and classrooms that have a more hermetic and conventional functioning.


Each type of climate has its own associated systems. The behaviour of the building is monitored and controlled by an automatic computer system that processes and manages an important set of information in order to optimize both comfort and energy consumption. The system has been programmed in favour of the maximum passive behaviour of the building and to minimize the use of non-renewable energy sources. The building reacts and adapts constantly, opening and closing itself, activating and deactivating itself, managing to use all the natural possibilities offered by the environment; therefore the comfort perception is much more real, less artificial than usual.


Materials A mineral material with a lot of thermal inertia and long service life has been chosen for the structure combined with low environmental impact materials for the secondary partitions. It has been a priority the use of organic or recycled materials and dry constructive systems as much reversible and reusable as possible


Water The building optimizes the whole water cycle by reducing the demand and consumption through the reuse of rainwater, greywater, yellow and waste water.


Products Behind Projects
Product Spotlight
News
Snøhetta designs new extension for the world’s oldest ski museum in Oslo
28 Mar 2024 News
Snøhetta designs new extension for the world’s oldest ski museum in Oslo

Global transdisciplinary architecture and design practice Snøhetta has designed a new entranc... More

10 public buildings that demonstrate architectural applications of precast concrete
27 Mar 2024 Specification
10 public buildings that demonstrate architectural applications of precast concrete

Precast concrete is made by casting concrete in a reusable mold. These molds are made of various mat... More

Sameep Padora and Associates creates a flowing, organic art center in southern India
26 Mar 2024 News
Sameep Padora & Associates creates a flowing, organic art center in southern India

Mumbai-based Sameep Padora & Associates (sP+a) has completed Hampi Art Labs in Toranagallu, a vi... More

Introducing Partner Thermory AS
26 Mar 2024 Partner News
Introducing Partner Thermory AS

Thermory AS offers a diverse product range that includes durable exterior cladding, decking, interio... More

Brooklyn Tower by ShOP Architects showcases a unique materiality
25 Mar 2024 News
Brooklyn Tower by ShOP Architects showcases a unique materiality

Brooklyn Tower, standing an impressive ninety-three stories tall with a unique neo-deco crown, is al... More

Doriana Fuksas, Martin Lesjak, Li Xiang and Steven Wright join Archello Awards 2024 jury
25 Mar 2024 Archello Awards
Doriana Fuksas, Martin Lesjak, Li Xiang and Steven Wright join Archello Awards 2024 jury

Doriana Fuksas, Martin Lesjak, Li Xiang and Steven Wright have been announced as Archello Awards 202... More

Vurpas Architectes converts former brick and concrete market into light-filled primary school in Lyon
22 Mar 2024 News
Vurpas Architectes converts former brick and concrete market into light-filled primary school in Lyon

The Eugénie Brazier school project in Lyon, France, undertaken by regional architecture studi... More

Detail: Pleated facade geometry of Bonfiglioli HQ by Peter Pichler Architecture
21 Mar 2024 Detail
Detail: Pleated facade geometry of Bonfiglioli HQ by Peter Pichler Architecture

Designed by Peter Pichler Architecture, the new Bonfiglioli Headquarters is located in Calderara di... More