Pilosio CMC Mount Edgecombe

Pilosio CMC Mount Edgecombe

PILOSIO S.p.A. as Manufacturers

Equipment Pilosio supplied:  200 square meters of standard P300 formwork for foundations and piers.  500 square meters of special steel formwork , divided into five sets for the construction of the viaduct piers and 350 square meters of additional special steel formwork made up of three sets for the construction of pier cups.  Two sets of formwork model, MAXIMIX, and custom-made products for a total of 940 square meters for the casting of the bridge decks.  The OMNIMODE system integrated with customized solutions for the construction of suspended working platforms during the launching phase of the decks, - Climbing system.


Pilosio Systems Thanks to technical skills acquired over the years, Pilosio was able to offer the best solution in terms of speed of work, site safety, optimization of equipment and, why not, also of aesthetics thanks to continuous on-site service. On this site, about 70% of the total equipment is custom-made according to the clients needs. The Pilosio technical department responded quickly and expertly to the various criteria of the project, such as rapid supply times, coordination with the various organizations involved in the project, the need to design a formwork system for the piers adaptable to two different sizes and a scaffolding system optimized for the launching bridge system.


Construction methods As foundations showed no significant issues, it was decided to use the standard formwork model P300. For the casting of piers and pier cups, the modularity of the P300 system would certainly have permitted the casting of octagonal piers, but given the particular characteristics of the project, the times would be more dilated giving less accurate aesthetic results than with a system of customized formwork. With its experience in infrastructure, Pilosio therefore studied and created special steel formwork to guarantee quicker application, a better aesthetic finish, and above all allow the realization of casting to 5 m height at a time to piers of up to 23m in height, as required by the company. The climbing system guaranteed fast feedspeed of jets and high safety for operators. Moreover, these custom formworks leave neat visible holes in the concrete, as the bars are sized and positioned necessary to the hold, but in an "orderly" manner. Finally, having 26 stacks of identical sections, the cost of the equipment would be softened by the highspeed work of the casting. In fact, with the equipment once delivered, the company could cast three piers simultaneously. For casting the pier cups, the CMC company asked for custom made formwork to cast 3 + 3 m in height. The piers are supported by towers in MP with safety access stairs.


The most complex part of the viaduct concerned the casting of the decks of the bridge done onsite with the launching bridge system. For the onsite casting of decks, approximately 20 m in length each, a mixed formwork system is used consisting of the OMNIMODE system for the base and exterior of the ashlar, with major beams in steel and secondary beams in wood to form the outer shape of the MAXIMIX beam. The second phase of the casting of the upper horizontal decking is made with SIMPLEX support towers, which are modular and extremely fast to assemble and handle.

Project Credits
Manufacturers
Product Spec Sheet

ElementBrand
ManufacturersPILOSIO S.p.A.
Product Spec Sheet
Manufacturers
Products Behind Projects
Product Spotlight
News
Introducing Partner Geopietra
19 Apr 2024 Partner News
Introducing Partner Geopietra

Geopietra® is an international brand and an Italian company founded in 1996, specialized in the... More

Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House
18 Apr 2024 News
Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House

In New Canaan, Connecticut, Shigeru Ban: The Paper Log House has opened as part of the 75th annivers... More

10 commercial buildings that benefit from planted facades
18 Apr 2024 Specification
10 commercial buildings that benefit from planted facades

The integration of nature into architecture marks a proactive urban response to the climate emergenc... More

Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular
17 Apr 2024 News
Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular

New York City-based creative studio HGX Design has completed the Hudson Valley Residence, a modern,... More

Key projects by Perkins&Will
17 Apr 2024 News
Key projects by Perkins&Will

Perkins&Will, a global interdisciplinary design practice, places architecture at its core. With... More

Archello Awards 2024 – Early Bird submissions ending April 30th
16 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Albion Stone creates stone bricks from “unloved” stone
15 Apr 2024 Innovations
Albion Stone creates stone bricks from “unloved” stone

A stone brick is a sustainable building material made using stone blocks and slabs that do not meet... More

25 best engineered wood flooring manufacturers
15 Apr 2024 Specification
25 best engineered wood flooring manufacturers

Engineered wood flooring is a versatile building product that offers several advantages over traditi... More