The new operational barracks of the Fire Department of Gubbio is the result of a competition won in 2010 . Private initiative provided for the possibility of hosting leased passive body of firefighters . The building is the completion of an old structure not completed . The purpose of the project was to complete and expand the existing structure already partially buffered .
The operation after the structural concrete infill continued dry slabs of concrete . The expanded volume is configured with rational aspect and serial interrupted by the volume scale , crown - wall aluminum sheet , painted red . On the ground floor workshop and garage vehicles will be covered and enclosed by glass industrial U -Glass , which will lighten the base and illuminate an evenly filtered space . In the square will place the castle of exercises with climbing wall.