New building in El Redín High School
Rubén Pérez Bescós

New building in El Redín High School

Otxotorena Arquitectos S.L. as Architects

The program's requirements of the project is based on the expectations of the growing number of students of the College, given the evolution of the demand for places. And it is built around the requirements of current legislation, under the specificities of the educational project.


The construction of a new set of classrooms is understood from the outset as an excellent opportunity to reset the suitability of the center's facilities. It seeks to satisfy the criteria that the experience has been settled regarding the design of teaching spaces. The building faces with ambition the discussion on the size of the expected local, its space and comfort qualities, the resolution of their functional requirements, evidence, and clarity of the circulations, the choice of materials and efficient facilities.


The project undertakes the orderly arrangement of a total of 10 basic teaching classrooms beside the current building of the College, in the orchards Aranzadi Pamplona, according to the following structure: 7 secondary classrooms, 2 Laboratories, and a Music Hall. The result is a compact building connected to the existing one and dependent on it. It is a trapezoidal volume (14 meters centerline by 45 long), and consists of 4 floors which are arranged in continuity with the center. The proposal chooses to exploit the particular conditions of the lot, with a geometry that adapts to the planning regulations and assumes an offset of 5 meters with respect to the perimeter of the plot and internal roads, given the decision of the property about its location and connections.


This scheme tries to solve optimally the relationship between the uses and communication, based on the needs in the field of evacuation and access control. Taking advantage of the topography, the elevation of the ground floor matches the playground located on the North facade, while the basement is directly associated to that in the existing building. The building has two entry points: one in the basement, which relates the general facilities of the center with the new building, and the main, located on the ground floor, overlooking the playground. Arguments of experience brought to school to show their preference for a ceramic coating for the entire new building towards greater assurance of maintenance and robustness.

Products Behind Projects
Product Spotlight
News
Introducing Partner Geopietra
19 Apr 2024 Partner News
Introducing Partner Geopietra

Geopietra® is an international brand and an Italian company founded in 1996, specialized in the... More

Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House
18 Apr 2024 News
Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House

In New Canaan, Connecticut, Shigeru Ban: The Paper Log House has opened as part of the 75th annivers... More

10 commercial buildings that benefit from planted facades
18 Apr 2024 Specification
10 commercial buildings that benefit from planted facades

The integration of nature into architecture marks a proactive urban response to the climate emergenc... More

Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular
17 Apr 2024 News
Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular

New York City-based creative studio HGX Design has completed the Hudson Valley Residence, a modern,... More

Key projects by Perkins&Will
17 Apr 2024 News
Key projects by Perkins&Will

Perkins&Will, a global interdisciplinary design practice, places architecture at its core. With... More

Archello Awards 2024 – Early Bird submissions ending April 30th
16 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Albion Stone creates stone bricks from “unloved” stone
15 Apr 2024 Innovations
Albion Stone creates stone bricks from “unloved” stone

A stone brick is a sustainable building material made using stone blocks and slabs that do not meet... More

25 best engineered wood flooring manufacturers
15 Apr 2024 Specification
25 best engineered wood flooring manufacturers

Engineered wood flooring is a versatile building product that offers several advantages over traditi... More