block_info: cstarchello_detailpages, Detail title
block_info: cstarchello_detailpages, Stories Authors
block_info: cstarchello_detailpages, Header App Detailpages
Changes have been saved.
block_info: cstarchello_detailpages, Stories Main
Ypasa involvement begins immediately after the construction of the structure of the museum, which is wrapped with a 3D surface to hold the elements of both the front and interior. Outside: the galvanized clamped tridilosa, which was waterproofed and placed a tripod which is anchored hexagonal panels.

How to solve the problem within?
The first requirement is that of a monolithic wall with irregular curves
Can not be used on drywall tridilosa by the characteristics of the surface and the material itself.
The first problem that arose was the displacement of tridilosa down as a skirt.
Was that resolving thermal, since multiple layers of conductive materials such as metal and the sheet structures, and color space would waterproofing hot.

Gypsum panels are placed with EIFS (Exterior Insulation Finishing System), whose operation is described below:

(IMAGE PROVIDED BY YPASA)

To solve the problem, we needed a flexible panel quality that the traditional drywall did not provide, however, based on the EIFS system, together with Panel Ypasa Rey latter Ypasa trading partner for just ov
Loading...
er 40 years develop PERMAFLEX panel or FLEX PERMABASE whose substrate containing polystyrene particles that make it flexible to respond to all requests.

To place the wall was required structural channels and channels tridilosa fastened to each 30 or 40 cm, upon which the panel is put PERMAFLEX. Then he adds a cementitious paste called Basecoat adhering polystyrene which is given an accommodation cuatrapeado. Once done, the sandpaper to refine polystyrene boards and there are no edges that can affect the final result, it is noteworthy that Ypasa also handled the thermal calculation for the thickness of polystyrene. above polystyrene because sanding is placed another layer of basecoat along with a mesh with 200 ° of elasticity, ready for finishing. Before this process, spraying a spray that is embedded and expands inside the tridilosa, this thermal insulation purposes. It is worth mentioning that Ypasa originally proposed this system to be applied on the facade, this, before the development of PERMAFLEX, solution was used inside the museum.

It should be emphasized that this technology was developed by two companies whose engineering is 100% Mexican.

___________


La participación de Ypasa comienza inmediatamente después de la construcción de la estructura del museo, la cual se envuelve con una “tridilosa” para sujetar los elementos tanto de la fachada como del interior. Al exterior: de la tridilosa se sujetó lámina galvanizada, la cual fue impermeabilizada y se colocaron unos trípodes de los que se anclaron los paneles hexagonales.

¿Cómo resolver el problema al interior?
El primer requerimiento es el de un muro monolítico con curvas irregulares
No se puede usar panel de yeso sobre la tridilosa por las características de la superficie y del material mismo.
El primer problema que se presentó fue el desplazamiento de la tridilosa hacia abajo, tal como una falda.
Había que resolver la cuestión térmica, ya que las múltiples capas de materiales conductores como el metal de las estructuras y la lámina, y el color del impermeabilizante harían el espacio muy caliente.

Los paneles de yeso se colocan con el sistema EIFS (Exterior Insulation Finishing System), cuyo funcionamiento se describe a continuación:

(IMAGEN PROVISTA POR YPASA)

Para resolver el problema, se necesitaba de un panel flexible, cualidad que el panel de yeso tradicional no brindaba, no obstante, basados en el sistema EIFS, Ypasa en conjunto con Panel Rey, este último aliado comercial de Ypasa durante poco más de 40 años desarrollan el panel PERMAFLEX o PERMABASE FLEX cuyo sustrato contiene partículas de poliestireno que lo hacen flexible para poder dar respuesta a todos los requerimientos.

Para colocar el muro fue necesario disponer canales y canaletas estructurales sujetadas a la tridilosa a cada 30 o 40 cm, sobre las que se pone el panel PERMAFLEX. Posteriormente se le agrega una pasta cementosa llamada Basecoat que adhiere el poliestireno al que se le da un acomodo cuatrapeado. Una vez hecho esto, el poliestireno se lija para afinar las juntas y que no queden bordes que puedan afectar al acabado final, cabe mencionar que Ypasa también se encargó del cálculo térmico para el espesor del poliestireno. encima del poliestireno, ya lijado se coloca otra capa de Basecoat junto con una malla con 200° de elasticidad, listo para recibir el acabado final. Antes de todo este proceso, se rocía un spray que se incrusta y expande al interior de la tridilosa, esto con fines de aislamiento térmico. Merece la pena mencionar que originalmente Ypasa propuso este sistema para aplicarse en la fachada, esto, anterior al desarrollo de PERMAFLEX, solución que fue utilizada en el interior del museo.

Resulta necesario resaltar que esta tecnología fue desarrollada por dos empresas cuya ingeniería es 100% mexicana.
block_info: cstarchello_detailpages, Involved companies (project team and products used)
block_info: cstarchello_detailpages, Relates links
block_info: cstarchello_detailpages, Connected

Connected Products

Connected Stories

View all

block_info: cstarchello_detailpages, Community Detail

Recent activity

View all

block_info: cstarchello_detailpages, Add comment form block

Your Opinion

Join

to share your opinion. Already joined?

block_info: cstarchello_detailpages, Detailpages leaderboard banner
block_info: cstarchello_detailpages, Homeslider to detail page
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    De Rotterdam by OMA, Vetrotech, Strabag Belgium and 1 more involved.

    Read more
     OMA as Architects
     Vetrotech Saint-Gobain as Manufacturers
     STRABAG Belgium nv as Contractors
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Library and Learning Center by Zaha Hadid, Rieder Smart Elements and Arup.

    Read more
     Zaha Hadid as Architects
     Rieder Smart Elements GmbH as Manufacturers
     ARUP as Engineers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Education and Tax Offices by UNStudio, Schüco and Artitec

    Read more
     UNStudio as
     Schüco as Manufacturers
     Artitec as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Museum of History by Lahdelma & Mahlamäki Architects, Progress Eco and Maciek Jeżyk Fotografia

    Read more
     Lahdelma & Mahlamäki Architects as Architects
     Progress Eco as Manufacturers
     Maciek Jeżyk Fotografia as Photographers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    IT University by Henning Larsen Architects, Knauf Danoline and HOWE

    Read more
     Henning Larsen Architects as Architects
     Knauf Danoline as Manufacturers
     HOWE as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    UBC Faculty Pharmaceutical Sciences by Saucier+Perrotte Architectes, Inland Glass & Aluminum Ltd. and NGX interactive

    Read more
     Saucier + Perrotte architectes as Architects
     Inland Glass & Aluminum Ltd. as Manufacturers
     NGX interactive as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Torre Agbar by b720 Fermin Vazquez Arquitectos, ROCKWOOL International A/S and Simón García

    Read more
     b720 Fermin Vazquez Arquitectos as Architects
     ROCKWOOL International A/S as Manufacturers
     Simón García as Association
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    London Aquatics Centre by Zaha Hadid, Foreco and VS-A.

    Read more
     Zaha Hadid as Architects
     Foreco as Manufacturers
     VS-A | Façade Engineering as Engineers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    MAS by Neutelings Riedijk Architecten, ABT Adviesbureau voor Bouwtechniek, Bureau Bouwtechniek

    Read more
     Neutelings Riedijk Architecten as Architects
     ABT Adviesbureau voor Bouwtechniek as Engineers
     Bureau Bouwtechniek as Architects
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Museo Soumaya by FR-EE Fernando Romero Enterprise, Geometrica and Ypasa

    Read more
     FR-EE Fernando Romero Enterprise as Architects
     Geometrica as Manufacturers
     ypasa as Sub-Contractor
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Fletcher Hotels by Benthem Crouwel, Sanindusa and Fletcher Hotels.

    Read more
     Benthem Crouwel as Architects
     Sanindusa as Manufacturers
     Fletcher Hotels as Developers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Marina Bay Sands by Safdie Architects, ROCKWOOL B.V. / ROCKPANEL Group, Grohe and 1 more involved.

    Read more
     Safdie Architects as Architects
     ROCKWOOL B.V. / ROCKPANEL Group as Manufacturers
     Grohe as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Watercube Beijing by Bolidt, Arup, Vector Foiltec and 1 more involved.

    Read more
     Bolidt as Floor Manufacturer
     ARUP as Engineers
     Vector Foiltec GmbH as Manufacturer Facade
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Court of Justice Hasselt by J. Mayer&Partner, Lens°ass architects and J.M.A. Photography.

    Read more
     J. MAYER H. und Partner as Architects
     Lens°ass architects as Architects
     José Manuel Alorda Photography as Photographers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Agora Theathre by UNStudio, Moso Bamboo and Archtitectenweb.

    Read more
     UNStudio as Architects
     MOSO Bamboo Products as Manufacturers
     Architectenweb Magazine as Media
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Library of Birmingham by Mecanoo, GVA Grimley and Theateradvies bv.

    Read more
     Mecanoo as Architects
     GVA Grimley Ltd. as Consultants
     Theateradvies bv as Consultants
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Theatre the Stoep by UNStudio, ARUP and A. de Jong Group.

    Read more
     UNStudio as Architects
     ARUP as Engineers
     A. de Jong Groep as Manufacturer
block_info: cstarchello_detailpages, Detailpages listing block

Discover more Art Galleries