block_info: cstarchello_detailpages, Detail title
block_info: cstarchello_detailpages, Stories Authors
block_info: cstarchello_detailpages, Header App Detailpages
Changes have been saved.
block_info: cstarchello_detailpages, Stories Main
These two student dormitories – a courtyard building in the forest and a highrise with a climbing wall – are located on the campus of Enschede university in the east of the Netherlands. Thanks to a functional mix of housing, study and leisure and the arrangement of the buildings as solitaires in the landscape, the university compound from the 1950ies is one of the few real campuses in the Netherlands.

According to a new masterplan, the dorms were originally meant to be built next to a new straight aisle through the forest. In order to avoid this interference with the landscape, we looked for alternative sites and found two more or less abandoned parking lots in strategic locations.

bending it: high rise with climbing wall

The highrise at Campagneplein also stands on a former parking lot and borders on a sports field in the south. The sports theme has been literally integrated into the architecture, in the form of a 30 metre high climbing wall.

In this case, the floor plan
Loading...
s as well as the building envelope were already determined by the client. From these starting points, we generated a 9-storey building next to the sports field, connecting to a 1-storey building housing a supermarket and some commercial spaces. On the north side, there’s an additional row of student studios on top of the low building, whose roof serves as a collective garden. The façade materials are the same as for the courtyard building in the forest: juicy red glass panels and dark brick.

The climbing wall with 2500 grips is the second highest in the Netherlands and forms the eyecatcher of the otherwise rather straight-forward building. It was a gift from the client to the inhabitants of the campus, because the university of Enschede has a very active and successful mountaineering club –however paradoxical that may sound in the flat Netherlands. As a climber in the Netherlands, one anyway has to resort to artificially created training spots, so why not combine architecture and climbing wall?

The folds of the wall look like the urban abstraction of a mountain and give the building a sculptural appearance. Seen from the sports field, it seems to be bending its hip. The brick frame around the glass panel façade emphasizes this impression and creates a logo-like shape. The western wall of the low-rise building is also covered in grips and can be used for „bouldering“.

The climbing wall instills a fun factor into the building and therefore forms a contrast to the chique red glass façade. As motive for a sculptural deformation, it also gives the highrise character and recognizability.
block_info: cstarchello_detailpages, Involved companies (project team and products used)
block_info: cstarchello_detailpages, Relates links
block_info: cstarchello_detailpages, Connected

Connected Products

block_info: cstarchello_detailpages, Add comment form block

Your Opinion

Join

to share your opinion. Already joined?

block_info: cstarchello_detailpages, Detailpages leaderboard banner
block_info: cstarchello_detailpages, Homeslider to detail page
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Watercube Beijing by Bolidt, Arup, Vector Foiltec and 1 more involved.

    Read more
     Bolidt as Floor Manufacturer
     ARUP as Engineers
     Vector Foiltec GmbH as Manufacturer Facade
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    De Rotterdam by OMA, Vetrotech, Strabag Belgium and 1 more involved.

    Read more
     OMA as Architects
     Vetrotech Saint-Gobain as Manufacturers
     STRABAG Belgium nv as Contractors
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    IT University by Henning Larsen Architects, Knauf Danoline and HOWE

    Read more
     Henning Larsen Architects as Architects
     Knauf Danoline as Manufacturers
     HOWE as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    UBC Faculty Pharmaceutical Sciences by Saucier+Perrotte Architectes, Inland Glass & Aluminum Ltd. and NGX interactive

    Read more
     Saucier + Perrotte architectes as Architects
     Inland Glass & Aluminum Ltd. as Manufacturers
     NGX interactive as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Torre Agbar by b720 Fermin Vazquez Arquitectos, ROCKWOOL International A/S and Simón García

    Read more
     b720 Fermin Vazquez Arquitectos as Architects
     ROCKWOOL International A/S as Manufacturers
     Simón García as Association
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    London Aquatics Centre by Zaha Hadid, Foreco and VS-A.

    Read more
     Zaha Hadid as Architects
     Foreco as Manufacturers
     VS-A | Façade Engineering as Engineers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    MAS by Neutelings Riedijk Architecten, ABT Adviesbureau voor Bouwtechniek, Bureau Bouwtechniek

    Read more
     Neutelings Riedijk Architecten as Architects
     ABT Adviesbureau voor Bouwtechniek as Engineers
     Bureau Bouwtechniek as Architects
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Museo Soumaya by FR-EE Fernando Romero Enterprise, Geometrica and Ypasa

    Read more
     FR-EE Fernando Romero Enterprise as Architects
     Geometrica as Manufacturers
     ypasa as Sub-Contractor
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Fletcher Hotels by Benthem Crouwel, Sanindusa and Fletcher Hotels.

    Read more
     Benthem Crouwel as Architects
     Sanindusa as Manufacturers
     Fletcher Hotels as Developers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Marina Bay Sands by Safdie Architects, ROCKWOOL B.V. / ROCKPANEL Group, Grohe and 1 more involved.

    Read more
     Safdie Architects as Architects
     ROCKWOOL B.V. / ROCKPANEL Group as Manufacturers
     Grohe as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Court of Justice Hasselt by J. Mayer&Partner, Lens°ass architects and J.M.A. Photography.

    Read more
     J. MAYER H. und Partner as Architects
     Lens°ass architects as Architects
     José Manuel Alorda Photography as Photographers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Agora Theathre by UNStudio, Moso Bamboo and Archtitectenweb.

    Read more
     UNStudio as Architects
     MOSO Bamboo Products as Manufacturers
     Architectenweb Magazine as Media
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Library of Birmingham by Mecanoo, GVA Grimley and Theateradvies bv.

    Read more
     Mecanoo as Architects
     GVA Grimley Ltd. as Consultants
     Theateradvies bv as Consultants
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Theatre the Stoep by UNStudio, ARUP and A. de Jong Group.

    Read more
     UNStudio as Architects
     ARUP as Engineers
     A. de Jong Groep as Manufacturer
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Library and Learning Center by Zaha Hadid, Rieder Smart Elements and Arup.

    Read more
     Zaha Hadid as Architects
     Rieder Smart Elements GmbH as Manufacturers
     ARUP as Engineers
block_info: cstarchello_detailpages, Detailpages listing block

Discover more Student Housing