Grenzlandmuseum Eichsfeld
© Foto Grimm Leinefelde

Woven steel as a symbol of boundary or how a museum brings the history of boundary to life

HAVER and BOECKER as manufacturer wire mesh cladding

Since 1995 the Grenzlandmuseum Eichsfeld is based in a former administration building of the GDR, closed to today´s Lower Saxony - Thuringian border.


At the former border crossing Duderstad-Worbis the visitors of the museum can inform themselves on more than 1.000 m² about the history of the German division.


A lot of original places, newspaper reports, pictures and films exemplify the reality in the time of the division of Germany. The museum is a memorial place for the history of the German - German division with a special view on the time when the Iron Curtain divided Germany and especially the territory of Eichsfeld.


The rearrangement During a complex rearrangement of the outside facilities a new visitor- and information center was built at the head quarter.


Glass, stainless steel and concrete are the elements of the new architecture. HAVER & BOECKER supplied the wire mesh façade which is situated around the upper floor. The semitransparent wire mesh EGLA-TWIN 4313 should symbolize the border fence or also the whole borderline situation.


"The intention was to have a clear view out of the ground floor of the building, on the first floor, where exhibitions, information and talks about the region take place, you get a different picture. Thus, the whole border situation is characterized and can be experienced," said Mr. Thustek, a staff member of the museum, in an interview with the newspaper “Thüringer Allgemeine Zeitung”. "Lot of glass is also a part of the architecture, it represents the changes and the peaceful revolution, which was emanated from the GDR citizens," said Thustek.


The wire mesh façade To aim optical requirements, the horizontal corners of the wire mesh facade were folded at 90°, so that the impression of a homogenous building envelope could be guaranteed.


Beside the black painted words “Grenzlandmuseum” on two sides of the facade, the light coloring of the facade by night is a highlight, which creates a special atmosphere around the museum. The viewer could see many different facets at the illuminated wire mesh façade by night. In addition to the strong symbolic power, which the architectural wire mesh got at this place, it works also as an effective sun protection. The stainless steel wire mesh type EGLA-TWIN 4313 breaks and filters the sunlight effectively and behind the screen it creates a comfortable fresh and light indoor climate.


In total HAVER & BOECKER delivered 93 m² of wire mesh in 16 ready-to-install elements, inclusive the standard mounting system of round rods, eyebolts and pressure springs.

Project Credits
Products used in this project
Product Spec Sheet

ElementBrandProduct name
manufacturer wire mesh claddingHAVER and BOECKER
Product Spec Sheet
manufacturer wire mesh cladding
Products Behind Projects
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More