block_info: cstarchello_detailpages, Detail title
block_info: cstarchello_detailpages, Stories Authors
block_info: cstarchello_detailpages, Header App Detailpages
Changes have been saved.
block_info: cstarchello_detailpages, Stories Main
The difficulty in designing an office building and a service station, lies in getting to the image of a single project, to overcome the difference in scale and unify the entire performance. Establish dialogue between the two built elements. The buildings are generated from the fold of the horizontal ground plane. A single material defines its geometry different spaces with different uses.

The release of the largest possible space for movement of vehicles necessary to adopt the solution placed under the car parking office building accessing the same for two ramps at the edges of the plot. At the same time the building is raised about 80 centimeters the dimension of access for a privileged position relative to the rest of the plot, allowing access through a ramp with the same width as the building. This rise along with the situation at a lower level of parking but they emphasize the initial idea of a material that folds and wraps the entire building.
Pin It

Tags

    block_info: cstarchello_detailpages, Relates links
    block_info: cstarchello_detailpages, Connected

    Connected Products

    View all

    block_info: cstarchello_detailpages, Facebook comments

    Comments

    Take me back up