Education and Tax Offices
Ronald Tilleman
DUO and Tax Offices Story by UNStudio DUO and Tax Offices
Product Spec Sheet

ElementBrandProduct Name
ManufacturersB&C Projects
Sanitary SystemsGeberit
SofaLaCividina
SUSHI | Sectional sofa
Facade systemsSCHÜCO
LightingPhilips Lighting Signify
Doorlevers ProlineArtitec Wallebroek bv

Product Spec Sheet
Sanitary Systems
Sofa
SUSHI | Sectional sofa by LaCividina
Facade systems
by SCHÜCO
Doorlevers Proline

DUO and Tax Offices

UNStudio as Architects

A greener approach to tall buildings in the post-iconic age - The Dutch tax office moves to one of Europe’s most sustainable offices


A new, 92 meter tall complex of soft, undulating curves marks the skyline of Groningen. This asymmetric, aerodynamic construction is set amidst small, ancient woodland, sheltering rare and protected species. The project includes the design, construction and financing of two public institutions; the national tax offices and the student loan administration. The commission from the RGD (National Buildings Service) includes, besides the architecture, the management and building maintenance and care of facilities and services for a period of 20 years. Accommodating 2,500 workstations, parking facilities for 1,500 bicycles and 675 cars in an underground garage, the building will be surrounded by a large public city garden with pond and a multifunctional pavilion with commercial functions.


The architecture aims to present these institutions with a softer, more human and approachable profile. Tall buildings are generally associated with mid-twentieth century modernism. Their harsh, businesslike exteriors contain powerful, inaccessible-seeming strongholds. By contrast, the DUO and Tax offices deliberately cloak a commanding public institution in an organic, friendlier and more future-oriented form.


"We paid a great deal of attention to how people would move through the building. The office spaces are designed in such a way that they do not create simple linear corridors leading to dead ends, but instead each corridor has a route which introduces a kind of landscape into the building. You can take endless walks through the building, where there is a great deal of transparency, also towards the surrounding landscape.” Ben van Berkel


Attainability; a mix of affordable and responsible – reaping material benefits of integral design and construction with a Design Build Finance Maintenance Operate Contract


The governmental office complex is built as part of a far-reaching form of public-private partnership (DBFMO) that is designed to effectuate on a more efficient use of public funds. The design, construction, financing, managing and maintenance of the building was hosted by one consortium consisting of Strukton, Ballast Nedam and John Laing. This consortium won the competition for the project on the basis of a combination of esthetic, technical and financial criteria. UNStudio, as the architect of the project, collaborated with Lodewijk Baljon for the landscape design, Arup for the engineering and Studio Linse as the interior advisor.


The life-cycle approach of a DBFMO contract requires that all relevant experts (designers, lawyers, installation specialists, financial specialists, facility specialists) are involved from the start of the project in order to find the best, most cost effective and environmentally-friendly solutions for the continued use and maintenance of the building. This working methodology stimulates not only creative and innovative ideas, but facilitates a reduction of total costs over the entire contract period compared to the traditional means of contracting. In PPP projects contracts are not awarded to the lowest bidder, but to the party with most effective solutions providing the best value for money.


“In a PPP-construction you have to consider all the details concerning maintenance and the sustainable use of the building from the very early stages. It is a unique way to gather all the specialists and the end user around the table from the very outset of the project.” Ben van Berkel


Exemplary sustainability “The design contains numerous new innovations related to the reduction of materials, lower energy costs and more sustainable working environments. It presents a fully integrated, intelligent design approach towards sustainability.” Ben van Berkel


The project is one of Europe’s most sustainable large new office buildings. The RGD brief prescribed a future-proof building that couples flexibility and sustainability with an esthetic of sobriety. The architectural response to this has been to strive for an all-round understanding of the concept of sustainability, including energy and material consumption, as well as social and environmental factors. Thus the sustainability manifests itself in reduced energy consumption (EPC 0,74), as well as significantly reduced material consumption. Bringing back the floor heights from 3,60 m to 3,30 m resulted in a total reduction of 7,5 m. on the entire building, which also lessens the impact of the building on the surroundings. Both inside and outside the architecture generates a bio-climate that is beneficial to both humans and the local flora and fauna.


All-round architectural sustainability: a sum of many parts Fins Sustainability and energy reduction have steered the design of the facade, which contains technical installations that are tailored to be durable and cause minimal environmental impact. The facade concept integrates shading, wind control, daylight penetration and construction in fin-shaped elements. These horizontal fins keep a large amount of the heat outside the building, reducing the requirement for cooling.


Concrete core activation Another technical feature of the building that contributes to its sustainable character is the combination of concrete core activation and underground long term energy storage. This appreciably reduces the demand for external energy sources.


Individual climate control for each workspace Creating a healthy, energy efficient interior climate and employee workspace comfort was also an important element in the design. Plenty of natural daylight and adjustable heating, ventilation and access to fresh air for individual workspaces contribute to the comfort of the workspaces throughout the building.


The 11-th floor A high pressure ventilation system with natural air inflow and outflow via main engineering shafts and the facade grills on the 11th floor reduces the need for artificial ventilation


Future possibilities In addition, the residual energy of the data center and offices can be used to heat the homes that will be realized in the future in the perimeter of the site.


Flexibility And last, but not least, the building is designed so that it can be transformed into housing in the future without major structural modifications. Therefore, the locations of elevators, stairs and technical spaces have been carefully considered, and a structural grid of 1,20 m. has been deployed, rather than the conventional office grid of 1,80 m.


Conclusion The inclusion of diverse passive and active environmental and energy efficient solutions has led to a building which is one of the most sustainable office buildings in the Netherlands.


Artitec Proline Doorlevers

Artitec Wallebroek bv as Doorlevers Proline

We are very proud that our advice and productline was appreciated by the men and women responsible for the choice in doorhardware at UNStudio and DUO2. They've chosen for our Proline series, which is a class 4 (EN1906) doorlever. We supplied them with a L-model (Tessa) on a longplate. Artitec Proline is the right choice for buildings where there is a lot of peopletraffic and where quality, aesthetics and budget has to come together.


Richard Zeinstra Artitec bv

Project Spotlight
Product Spotlight
News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert
18 Mar 2024 News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert

Mumbai-based Sanjay Puri Architects has completed the Nokha Village Community Centre, an architectur... More

Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024
15 Mar 2024 News
Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024

In this Archello series, we look at each of the seven nominated projects (five architecture finalist... More

25 best mosaic wall tile manufacturers
15 Mar 2024 Specification
25 best mosaic wall tile manufacturers

Mosaic wall tiles are produced in an enormous range of colors, shapes and finishes, and from a varie... More

Introducing Partner Motion Facades
15 Mar 2024 Partner News
Introducing Partner Motion Facades

Motion Facades specializes in supplying advanced facade systems for luxury real estate projects. Its... More

Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel
15 Mar 2024 Archello Awards
Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel

Architects Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores have been an... More

JSWD completes new office complex in Bonn unified by triangular facade elements
14 Mar 2024 News
JSWD completes new office complex in Bonn unified by triangular facade elements

International architectural firm JSWD has completed the Neuer Kanzlerplatz office complex in the cit... More

Archello Awards 2024 expands with 'Firm Awards'
14 Mar 2024 Archello Awards
Archello Awards 2024 expands with 'Firm Awards'

Today Archello introduces a new set of Firm Awards categories to widen the scope of the Archello Awa... More

Studio Egret West develops plans for new Passivhaus homes
13 Mar 2024 News
Studio Egret West develops plans for new Passivhaus homes

London-based multidisciplinary architecture and design practice Studio Egret West has developed plan... More