The competition for the New Tokyo National Stadium which began in July and ended in September 2012 asked for a proposal for the 2020 Olympic Games. We made a design whose intention was to allow people to feel very close to the activity within, to the athletes and football players, to the exciting atmosphere in which the spectator is involved directly in the games. At the same time we also wanted to design a space which was flexible, that could accommodate the wide range of sports intended for this kind of building, by focusing specifically on circulation that would make movement easy and fluid. In front of the large stadium area there is a main public space that creates a new Festival Sport Plaza, whose roof protects people from rain and provides shadow in the hot summer months. The space was intended to be used for exterior and extraneous events like concerts, oobon parties, political campaigns, small sporting activities, fairs, and many others.


The main roof of the stadium is characterized by a big circular 120m wide aperture that can be kept open or closed when a light dome of steel and fabric is slid into place on binaries. When open, the dome assimilated the Pantheon in Rome. The size of the hole corresponds to the football field below and allows natural light to penetrate and illuminate the grass field and running tracks. This atmosphere is unique in the history of the games, as it will be a new and exciting space for its involved spectators.


The circulation allows for the people to access the roof via a ramp that circles around the stadium and ends at the top, moving people onto the outdoor tracks, and covered auditorium. For the first time in history, the roof may be used by people to practice sports and watch the many different events that may be unfolding bellow or under the roof's dome. The intention was to make the structure capable of sustaining, within the limited plot of land, many of the activities which in previous Olympics used to need multiple facilities.


For the first time in the Stadium many different events can take place simultaneously in different places: the main arena of 80,000 seats, the covered plaza in front, the big roof with sport activities and a movable dome. It is not a fixed sport stadium but a multiple activities complex. In case of football, the main arena can be enlarged to 90,000 seats, by moving 5 meters down the football field and extracting 10,000 additional seats. The wooden facade is reminiscent of ancient Japanese architecture, however it is also intended to blend with the forest of columns that surround the structure and hold up the roof, ramp and tracks. In essence, it is a structure of whose like we have not seen before applied to the famous world athletic games.


PROJECT CREDITS


location Tokyo, Japan


program Olympic Stadium – 2020 Olympic Games


client Japan Sports Council


competition dates July – September 2012


architecture project Andrea Maffei


design team Takeshi Miura, Alessandra De Stefani, Takatoshi Oki, Roberto Balduzzi, Paolo Evolvi, Stefano Bergagna, Pietro Bertozzi, Chiara Zandri / Andrea Maffei Architects


associate architect Hiroshi Yoshino, Mitsuyoshi Miyazaki / Yoshino Hiroshi Architect Office


structures prof. Massimo Majowiecki / Studio Tecnico Majowiecki


mechanical systems Kankyo-Engineering Co., Ltd.


total area 301.215 sqm


capacity 90.000 seats


cost estimation US$ 1,300,000,000

Project Spotlight
Product Spotlight
News
Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House
18 Apr 2024 News
Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House

In New Canaan, Connecticut, Shigeru Ban: The Paper Log House has opened as part of the 75th annivers... More

10 commercial buildings that benefit from planted facades
18 Apr 2024 Specification
10 commercial buildings that benefit from planted facades

The integration of nature into architecture marks a proactive urban response to the climate emergenc... More

Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular
17 Apr 2024 News
Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular

New York City-based creative studio HGX Design has completed the Hudson Valley Residence, a modern,... More

Key projects by Perkins&Will
17 Apr 2024 News
Key projects by Perkins&Will

Perkins&Will, a global interdisciplinary design practice, places architecture at its core. With... More

Archello Awards 2024 – Early Bird submissions ending April 30th
16 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Albion Stone creates stone bricks from “unloved” stone
15 Apr 2024 Innovations
Albion Stone creates stone bricks from “unloved” stone

A stone brick is a sustainable building material made using stone blocks and slabs that do not meet... More

25 best engineered wood flooring manufacturers
15 Apr 2024 Specification
25 best engineered wood flooring manufacturers

Engineered wood flooring is a versatile building product that offers several advantages over traditi... More

Austin Maynard Architects designs a “pretty” wellness-enhancing home in Melbourne
12 Apr 2024 News
Austin Maynard Architects designs a “pretty” wellness-enhancing home in Melbourne

Australian architectural studio Austin Maynard Architects recently completed a new two-story house i... More