block_info: cstarchello_detailpages, Detail title
block_info: cstarchello_detailpages, Stories Authors
block_info: cstarchello_detailpages, Header App Detailpages
Changes have been saved.
block_info: cstarchello_detailpages, Stories Main
The Confederation of Employers of Albacete (FEDA) is a nonprofit organization representing and supporting the business network in the Region. Due to the evolution of its activities and growth of services, the organization raised the idea of bringing together in a sole building all the instalations that were scattered throughout the city of Albacete. This idea was the seed of this project.

From the beggining it became apparent that this initiative would be a milestone for Albacete, because FEDA has a high level of representation in the city, and because it offers many services to its companies. Besides, the new building aspires to endow new life to a new neighborhood which is being built between a hard industrial and services center, Campollano estate, and the city center.

We have designed this project from the idea of ‘diffuse limits’ and ‘blur’ architecture. Our intention was to cover the volume of the building with a veil capable of bluring it and making it change. We wanted the building to react to the variations
Loading...
of weather and the movement of users with different levels of brightness and textures.

Looking at it from outside to inside, the skin would feel 'fleshy', full of shades and thick. And at the same time it would appear as a distant and undefined object, so that the observer doesn't have a stable reference, and could not keep a static link to the building and remember only an image. On the contrary the building would respond to the user in movement generating different glances and changing perceptions.

In the opposite view, this second skin had to be perceived as a space with constant shape and without scale changes. Likely, the inner façade with the windows is the one able to defragment the building because the windows are very large compared to the human scale. This makes the user relate with the exterior skin, that has small scale holes and polimeric texture, in a closer way. But, again this feeling is distorted by the separation of the two layers. From inside, the perception of the façade system had to “fluff up” the limits of the building.

The project is solved between two poles: the strong and clear volume, compared to the delicate and blurring façade. The strength of the simple volume is balanced by the volatile and delicate effect that the façade system gives. All this creates a slight feeling of strangeness while perceiving this diffuse landmark.

One of the most significant parameters at the architectural level has been the concretion of the program, its definition and characterization. And, in parallel, the opportunity for FEDA to upgrade their organizational processes.

Together with the directors, workers and users we created a map of needs, and we did a rearrangement and reorganization of internal work processes. All this, permitted a spatial change: from a system of cubicles to a more open space floor, where the horizontality among self-managed teams is more evident, and helped with the implementation of technological informational and documentation systems.

This new organization forced the project to solve two problems: first, the creation of a flexible and reprogrammable floors, and, second the adaptation of the working atmosphere.

For the first problem we proposed a reticular structure with few columns, allowing a redistribution of the program according to the needs of the future; and second, a technical floor and ceiling that carries all facilities. With all this we can leave floors completely free for use.

And regarding the second, FEDA required from the beginning that people who worked in the building will enjoy a high level of comfort, and, on our part, we wanted to create a 'highly emotional' spaces to work. The solving of the problem became a challenge.

We tried to create a friendly relationship with the user. The small vegetation organizes the access. Its materiality, temperature, resonance ... even the opening speed of the automatic doors, make the user subtly feel that he has entered into an attenuated area. And it’s interesting to note how people lower their voices naturally when they enter the building. We could not exactly say why, but it’s probably due to the lighting and its ability to dazzle, or the sound absorption without echoes, or the proportions of the space, or more probably, all this experiences combined.

The access space extends from side to side of the floor between opposing facades. This is the first part of 'interior void' that articulates the building. From this space you can access all floors, and in it, information sites, exhibition and meeting places are located.

We tried that this space had a very controlled atmosphere. You can feel how the perception of something heavy is inverted to the perception of lightweight. Where the lighting was different and the sound controlled, where always exists indoor-outdoor relationship. However the scale is not a person’s scale. We have tried to introduce the contradictions of the blurring exterior facade into the core of the building.

And finally, we have designed open work spaces with high thermal and acoustic conditioning. We have built an extremely neutral area that invite users to bring their objects. We want the workers build their workplaces in highly emotional way. We believe that this will build a new landscape less anodyne and more interesting and real. A transparent landscape whose reality becomes evident to someone who enters the enclosure to get the collective support of the organization.

This project works the relationship between the person and the building through the materials and conditioning, trying to improve the sensory and emotional perception of the workspace by its workers, members and visitors. This is a way of re-humanizing architecture and, as far as we’re concerned, this is an obligatory step to rethinking workplaces.
block_info: cstarchello_detailpages, Involved companies (project team and products used)
block_info: cstarchello_detailpages, Relates links
block_info: cstarchello_detailpages, Connected

Connected Products

block_info: cstarchello_detailpages, Add comment form block

Your Opinion

Join

to share your opinion. Already joined?

block_info: cstarchello_detailpages, Detailpages leaderboard banner
block_info: cstarchello_detailpages, Homeslider to detail page
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Watercube Beijing by Bolidt, Arup, Vector Foiltec and 1 more involved.

    Read more
     Bolidt as Floor Manufacturer
     ARUP as Engineers
     Vector Foiltec GmbH as Manufacturer Facade
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    De Rotterdam by OMA, Vetrotech, Strabag Belgium and 1 more involved.

    Read more
     OMA as Architects
     Vetrotech Saint-Gobain as Manufacturers
     STRABAG Belgium nv as Contractors
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    IT University by Henning Larsen Architects, Knauf Danoline and HOWE

    Read more
     Henning Larsen Architects as Architects
     Knauf Danoline as Manufacturers
     HOWE as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    UBC Faculty Pharmaceutical Sciences by Saucier+Perrotte Architectes, Inland Glass & Aluminum Ltd. and NGX interactive

    Read more
     Saucier + Perrotte architectes as Architects
     Inland Glass & Aluminum Ltd. as Manufacturers
     NGX interactive as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Torre Agbar by b720 Fermin Vazquez Arquitectos, ROCKWOOL International A/S and Simón García

    Read more
     b720 Fermin Vazquez Arquitectos as Architects
     ROCKWOOL International A/S as Manufacturers
     Simón García as Association
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    London Aquatics Centre by Zaha Hadid, Foreco and VS-A.

    Read more
     Zaha Hadid as Architects
     Foreco as Manufacturers
     VS-A | Façade Engineering as Engineers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    MAS by Neutelings Riedijk Architecten, ABT Adviesbureau voor Bouwtechniek, Bureau Bouwtechniek

    Read more
     Neutelings Riedijk Architecten as Architects
     ABT Adviesbureau voor Bouwtechniek as Engineers
     Bureau Bouwtechniek as Architects
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Museo Soumaya by FR-EE Fernando Romero Enterprise, Geometrica and Ypasa

    Read more
     FR-EE Fernando Romero Enterprise as Architects
     Geometrica as Manufacturers
     ypasa as Sub-Contractor
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Fletcher Hotels by Benthem Crouwel, Sanindusa and Fletcher Hotels.

    Read more
     Benthem Crouwel as Architects
     Sanindusa as Manufacturers
     Fletcher Hotels as Developers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Marina Bay Sands by Safdie Architects, ROCKWOOL B.V. / ROCKPANEL Group, Grohe and 1 more involved.

    Read more
     Safdie Architects as Architects
     ROCKWOOL B.V. / ROCKPANEL Group as Manufacturers
     Grohe as Manufacturers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Court of Justice Hasselt by J. Mayer&Partner, Lens°ass architects and J.M.A. Photography.

    Read more
     J. MAYER H. und Partner as Architects
     Lens°ass architects as Architects
     José Manuel Alorda Photography as Photographers
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Agora Theathre by UNStudio, Moso Bamboo and Archtitectenweb.

    Read more
     UNStudio as Architects
     MOSO Bamboo Products as Manufacturers
     Architectenweb Magazine as Media
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Library of Birmingham by Mecanoo, GVA Grimley and Theateradvies bv.

    Read more
     Mecanoo as Architects
     GVA Grimley Ltd. as Consultants
     Theateradvies bv as Consultants
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Theatre the Stoep by UNStudio, ARUP and A. de Jong Group.

    Read more
     UNStudio as Architects
     ARUP as Engineers
     A. de Jong Groep as Manufacturer
  • HOW IT'S MADE

    Discover the products, stories and building teams behind the project.

    Library and Learning Center by Zaha Hadid, Rieder Smart Elements and Arup.

    Read more
     Zaha Hadid as Architects
     Rieder Smart Elements GmbH as Manufacturers
     ARUP as Engineers
block_info: cstarchello_detailpages, Detailpages listing block

Discover more Offices