block_info: cstarchello_detailpages, Detail title
block_info: cstarchello_detailpages, Stories Authors
block_info: cstarchello_detailpages, Header App Detailpages
Changes have been saved.
block_info: cstarchello_detailpages, Stories Main
The company Blaas in Bolzano is specialized in electro-mechanics. In the new head office the company presents its new product range and offers repair service.
On the ground floor of the building there is the sales division, on the first floor the exposition area and the repair shop. All administration offices are located on the second floor. The overall impression of the structure is a homogenous and closed building. Nevertheless, there exists a separation between the public and the private sector. The client can perceive this clear and formal internal division already from the outside.

The glass façade on the Northern side provides a maximum of visibility and transparency to the exhibition and sales area. The private spaces such as repair offices, stockrooms and offices have their façades exposed to the South, East and West which are protected with a sun screening system.
In order to establish an optimal relation between natural light, development and planning of spaces there has been created a luminous entrance hall in the centre of the building with an inner courtyard. This green open spot permits the administrative sector of the second floor to receive ample natural light and at the same time it generates a protected, quiet recreation area for the staff.
Pin It

Tags

    block_info: cstarchello_detailpages, Relates links
    block_info: cstarchello_detailpages, Connected

    Connected Products

    View all

    block_info: cstarchello_detailpages, Facebook comments

    Comments

    block_info: cstarchello_detailpages, Community Detail

    Recent activity

    View all

    • January 19, 2011 | architect Patrik, Pedó updated the Building Length, Building Width, Building Height of the project Blaas's passport
    • January 19, 2011 | architect Patrik, Pedó updated the Building Length, Building Width, Building Height of the project Blaas's passport
    • January 19, 2011 | architect Patrik, Pedó updated the Gross External Area, Building Length, Building Width, Building Height of the project Blaas's passport
    • January 19, 2011 | Camara, Dmitry is now following the project Blaas
    • January 19, 2011 | artist Jonathan Holden voted the project Blaas with 5 stars
    • January 18, 2011 | Manco, Ali voted the project Blaas with 5 stars
    • January 18, 2011 | davituliani, zura voted the project Blaas with 5 stars
    • January 17, 2011 | architect Patrik, Pedó voted the project Blaas with 5 stars
    Take me back up