RAU as Architects

The new head office for the energy grid company Alliander in Duiven (The Netherlands) was recently inaugurated. RAU architects is responsible for the renovation of the existing buildings and the extension, which will house 1550 workers. This is the first renovation project in The Netherlands to obtain the BREEAM-NL outstanding sustainability certificate.


Interconnectivity was the main principle for the design and applies for all its parts and works on all levels. The existing buildings, which were composed of different blocks, are respected and integrated into the new design: up to 83% of the existing constructions remain. A large atrium covered by an iconic roof connects the six different volumes visually, programmatically as well as logistically, and creates an “in between” space where employees and visitors can meet. Large skylights are placed on the curved roof in order to increase the amount of daylight in the atrium and the façade is fully built of glass, creating a strong link with the landscape, contributing to a healthy and inspiring workspace.


The facades of the existing buildings are maintained, including the windows, and a “skin” is attached to them, improving the insulation value, avoiding heat losses and reducing the energy demand. On the sides, which are oriented towards the atrium, larger windows, which can be opened, are placed, creating a close visual relation with the atrium and allowing natural ventilation.


Efficiency and effectiveness are guiding principles throughout the design. In intervention, material use, footprint, costs and burdening of the environment. In return, functionality, comfort, innovation, identity and a positive impact on society are achieved.


Circularity Circularity has been an integral part of the design in many ways: respecting the majority of the existing constructions, using waste wood for the facades, reusing the concrete from the parts which were demolished, reusing the steel construction for the extensions of the buildings, recycling the asphalt from the existing roofs, reusing the existing toilets and ceiling plates and converting the existing doors into new furniture, amongst other things. The metal structure from the roof is designed with the help of a roller coaster construction group, minimalizing its weight, thus reducing the unnecessary use of raw materials and allowing disassembly for later reuse. A “raw material passport” is made in order to assure the reuse of all the materials in the future. This document contains information on all the raw materials, which are added during the renovation, the new installations, and the existing materials which where already there. It includes information about who has handled the materials, where they were temporarily stored and ways in which they can be reused.


Energy positive The building complex provides more energy than needed, which can be used by “neighbors” in the surroundings through the Smart Grid, starting a Green Alliance in the community. The design of the building optimizes the use of energy, the design of the roof stimulates natural ventilation, and the atrium becomes a “second skin” for the closed volumes, creating an in between climate.


Thanks to the use of solar panels and underground water for thermal storage, it is also CO2 neutral. The solar panels are placed in the parking as shading and protection for the cars, giving them a double function. Since these were placed first, it was possible to achieve an energy positive building site for the first time in the Netherlands.


The consortium for the Design & Build of Alliander in Duiven consists of Rau Architecten, VolkerWesselsVastgoed, Fokkema& Partners, Innax, Kuiper Compagnons, Van Rossum R.I., Boele&vanEesteren, Homij and Turntoo.

Liander

Fokkema & Partners Architecten as Interior Architects

The first renovation project in the Netherlands to obtain a BREEAM-NL outstanding sustainability certificate, up to 93% of all materials used in this building are reused. In this way, building actually becomes resource depot.

Circularity is an integral part of this design in numerous ways: respecting the majority of the existing constructions, using waste wood for the facades, reusing the concrete from the parts which were demolished, reusing the steel construction for the extensions of the buildings, recycling the asphalt from the existing roofs, reusing the existing toilets and ceiling plates and converting existing doors in into new furniture amongst other things.

The metal structure for the roof was designed with the help of a roller coaster construction group, minimizing its weight and thus reducing the unnecessary use of raw materials.

Alongside this, a ‘raw material passport’ was made in order to assure the reuse of all the materials in the future. This document contains information on all the raw materials which were added during the renovation and the new installation, as well as the existing materials which were temporarily stored and ways in which they can be reused.


More from the Manufacturer:


The transformation of the business park of energy grid company Alliander provides a strategy to revive seemingly outdated real estate: To umbrella several existing buildings with a roof, creating both extra indoor space, as well as a “greenhouse” which allows the office to obtain a positive energy balance. The buildings are then interconnected by walkways.


Outfitting the walkways with features like a coffee bar, lounges and (flex) workstations makes the publicly accessible atrium the ultimate place for connection and the beating heart of the building. Up to 93 percent of all materials are part of a circular model: the building is actually a resources depot. Thanks to creative solutions from the entire consortium in collaboration with employees of Alliander, 80 percent of these resources are reclaimed materials. Moreover it is the first renovation to obtain a BREEAM-NL outstanding certificate.


To house laboratories, workshops, technical training centres and offices, the existing building interiors were completely remodeled; with re-use of existing Casco elements, furniture and ceiling plates. Each floor is accessed from the atrium and visible for all user groups to encourage interaction. Entire office floors are arranged according to a type of activity - the workshop for collaboration, the library for concentrated working and the 'classic' office space. One of the advantages is that the interior can be adapted to changing needs with limited interventions.


Fokkema & Partners was responsible for the design of the circular interior in the consortium VolkerWessels Vastgoed with Rau Architects, Boele&vanEesteren, Innax, Kuiper Compagnons, van Rossum Raadgevende Ingenieurs and Turntoo.

Project Spotlight
Product Spotlight
News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
24 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More

Barrisol Light brings the outdoors inside at Mr Green’s Office
22 Apr 2024 News
Barrisol Light brings the outdoors inside at Mr Green’s Office

French ceiling manufacturer Barrisol - Normalu SAS was included in Archello’s list of 25 best... More

Peter Pichler, Rosalba Rojas Chávez, Lourenço Gimenes and Raissa Furlan join Archello Awards 2024 jury
22 Apr 2024 Archello Awards
Peter Pichler, Rosalba Rojas Chávez, Lourenço Gimenes and Raissa Furlan join Archello Awards 2024 jury

Peter Pichler, Rosalba Rojas Chávez, Lourenço Gimenes and Raissa Furlan have been anno... More