Faber Headquarters
Massimo Crivellari

Faber Headquarters

GEZA Architettura as Architects

The project for the new offices of Faber Industrie Spa is part of a comprehensive strategy aimed at developing and planning the whole area owned by the company, which includes the construction of a new plant, about to be completed, the reorganization of in-house logistics, access control, parking lot and roads, as well as the general site plan and landscape. The new Headquarters are composed of two east-to-west longitudinal volumes of different heights and lengths, linked together by a central building serving as hall/reception, waiting area and functional connection between several areas. The southern building includes communal and representation areas, and namely some meeting rooms, an auditorium and a technological centre on the ground floor; administration, marketing and technical offices on the first floor. The northern building, the shortest and tallest, includes the offices related to the adjacent plant and to staff on the ground floor; the first floor houses the top managers’ offices and the Board’s room; the second floor is devoted to all activities linked to technological research and development. Moreover, another volume in the basement of the central building is created to accommodate a private garage, technical and technological rooms, the corporate records and service areas. Special care was devoted to the relation between spatial rigor, flexibility of use over time and space, and volumes capable of offering high quality views and perspectives, by using simple materials and finishes of great visual impact. The large glazed surfaces allow using always direct and indirect natural light, controlled with automated screens and shutters. Special care was also given to the indoor/outdoor relation, by developing a landscape plan directed eastward to the plant and westward to farmland. To the south, the project connects with an area currently occupied by the entrance lodge and warehouses, which has been entirely redesigned and reorganized.

Project Spotlight
Product Spotlight
News
Introducing Partner Geopietra
19 Apr 2024 Partner News
Introducing Partner Geopietra

Geopietra® is an international brand and an Italian company founded in 1996, specialized in the... More

Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House
18 Apr 2024 News
Shigeru Ban’s Paper Log House at Philip Johnson’s Glass House

In New Canaan, Connecticut, Shigeru Ban: The Paper Log House has opened as part of the 75th annivers... More

10 commercial buildings that benefit from planted facades
18 Apr 2024 Specification
10 commercial buildings that benefit from planted facades

The integration of nature into architecture marks a proactive urban response to the climate emergenc... More

Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular
17 Apr 2024 News
Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular

New York City-based creative studio HGX Design has completed the Hudson Valley Residence, a modern,... More

Key projects by Perkins&Will
17 Apr 2024 News
Key projects by Perkins&Will

Perkins&Will, a global interdisciplinary design practice, places architecture at its core. With... More

Archello Awards 2024 – Early Bird submissions ending April 30th
16 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Albion Stone creates stone bricks from “unloved” stone
15 Apr 2024 Innovations
Albion Stone creates stone bricks from “unloved” stone

A stone brick is a sustainable building material made using stone blocks and slabs that do not meet... More

25 best engineered wood flooring manufacturers
15 Apr 2024 Specification
25 best engineered wood flooring manufacturers

Engineered wood flooring is a versatile building product that offers several advantages over traditi... More