Extension of ‘Tweede Kamer der Staten Generaal’

het Architectenforum as Architects

1 Entrance building


Location


Opposite the existing House of Parliament in The Hague the state owned a site with a number of valuable monumental buildings, some of which had been abandoned for decades. We won the competition to transform this site for use by the Dutch parliament, including a dedicated space for ‘parliamentary inquiries’ and office spaces.


Opening up


The introverted character of the complex was not compliant with the new public and representative functions. We designed for a "transparent government", by opening the site with a new entrance building that connects the main buildings and reconnects them to the public realm. The new central space for ‘parliamentary inquiries’ is the natural focus point, visible from the three main buildings. The representative buildings are used efficiently for offices, from the basement to the attic. This allows for a modest new volume, combining an environmentally sound solution with ‘breathing space’ for the listed buildings.


2 Former State archives


Transformation


The new challenge. How to breathe life into buildings that no longer function properly or are abandoned? Existing buildings often offer inspiring spaces, triggering exceptional solutions inconceivable in a new building. When done right, transformation is the most sustainable way to build.


One trick pony?


The archive depot is a functional steel shelving unit surrounded by brick facades. Architect Van Lokhorst used the most advanced techniques available to achieve a safe solution. Fire posed the biggest threat. Artificial light was not considered safe enough, instead daylight can reach all floors through skylights, windows and grate floors. A side effect of these solutions was the unstable indoor climate, hot in summer, drafty in the winter. The dense structure and the ample floor heights seemed to exclude any reconversion.


Concept


We managed to build new office space in this building without removing any structural components. How did we achieve this? The offices come in boxes with extra height, to maximize the available daylight and views. We used the space between these boxes and the existing façade to ventilate excess heat in summer, while in winter the cavity is an extra insulating layer. Glass floors make sure the daylight reaches even the lowest floors. In the center the existing shelving showcase the ingenuity of the original solution. 3 Plein 23


Keep it clean


The former 'Logement van Amsterdam' is a richly decorated city palace, dating from 1737. The most beautiful rooms now serve as meeting rooms. The other rooms are transformed into offices. To prevent mutilation of the vulnerable interior by new lighting fixtures, ventilation ducts and shelving, we used custom-made furniture. The ' backbone ' of the furnishings consists of elegant steel frames to which adjustable maple countertops, cabinets and lighting fixtures can be linked. All the cabling is housed in the furniture. The lighting is can be directed up and down to provide general and task lighting. The furniture is placed in the axis of the rooms, so every workplace shares a view of the central square (Plein).

Project Credits
Product Spec Sheet

Project Spotlight
Product Spotlight
News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert
18 Mar 2024 News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert

Mumbai-based Sanjay Puri Architects has completed the Nokha Village Community Centre, an architectur... More

Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024
15 Mar 2024 News
Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024

In this Archello series, we look at each of the seven nominated projects (five architecture finalist... More

25 best mosaic wall tile manufacturers
15 Mar 2024 Specification
25 best mosaic wall tile manufacturers

Mosaic wall tiles are produced in an enormous range of colors, shapes and finishes, and from a varie... More

Introducing Partner Motion Facades
15 Mar 2024 Partner News
Introducing Partner Motion Facades

Motion Facades specializes in supplying advanced facade systems for luxury real estate projects. Its... More

Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel
15 Mar 2024 Archello Awards
Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel

Architects Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores have been an... More

JSWD completes new office complex in Bonn unified by triangular facade elements
14 Mar 2024 News
JSWD completes new office complex in Bonn unified by triangular facade elements

International architectural firm JSWD has completed the Neuer Kanzlerplatz office complex in the cit... More

Archello Awards 2024 expands with 'Firm Awards'
14 Mar 2024 Archello Awards
Archello Awards 2024 expands with 'Firm Awards'

Today Archello introduces a new set of Firm Awards categories to widen the scope of the Archello Awa... More

Studio Egret West develops plans for new Passivhaus homes
13 Mar 2024 News
Studio Egret West develops plans for new Passivhaus homes

London-based multidisciplinary architecture and design practice Studio Egret West has developed plan... More