1/2 Stadium
GU Yunduan

1/2 Stadium

Interval Architects as Architects

The project calls for an intervention of the existing sport ground in a public school of Beijing. We define the project as a 1/2 stadium because the scale, size, formal expression and use of the architecture stand in between an official stadium and a blank sport field.


The site is in the northern part of the school where one-third of it is in the shadows throughout the year. It's charged with a negative emotion and solitude which contrast greatly with the various activities that happen there every day. Originally the sport field consists of an irregular track surrounded by an outdoor stage, a long stand, a flag-raising platform, several table-tennis tables, and two basketball fields. In the beginning, principal of the school asked for a renovation of the existing 12mx8mx0.8m outdoor stage and a 120-meter long stand opposite to the stage. However we think that on a site which measures 170,000 square meters, a mere renovation of the stage and stand is only a fragmented effort to better the appearance of individual components on the site.


The problem with the sport ground is that there is no sense of place and a lack of coherent relationship between various programs. This results in a serious of problems including low visibility between stage and stand, lack of use of table tennis tables and basketball fields, mutual exclusion between programs and ambiguous identity of the entire sport ground.


As opposed to the fragmented intervention suggested by the client, we offered a comprehensive approach by proposing a discontinuous loop structure that embodies all the programs into one single system yet allows each program to maintain its operational independence.


The sport ground is more unified with a single formal language and material. Existing trees no longer exist as barriers on the site but as buffer zones that connect different programs. The outdoor stage with a large cantilevered roof and the ping-pong pavilion on the north side of the sport ground eliminate the negative emotion in this shadowy zone. The horizontal continuity created by its scale make the stage and the table-tennis area more articulated on the site. The ping-pong pavilion also provide more seats and act as a wind barrier.


Activities that happen on this sport ground range from physical education classes to recess time ball games, from official athletic meet to a casual around-the-track walk after lunch. The complex programs and events that happen there results in this particular type of architecture which we called “1/2 stadium”.

Project Spotlight
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More