Cherry Yard‘s House

Cherry Yard‘s House

Office for Explicit Architecture as Architects

Explicit Architecture’s design for the renovation and expansion of a family home in Krems is based upon the exciting interplay of old and new.


The existing 1960s structure was gutted, adapted, and ensconced by an architectural sculpture that adds an invigorating contrast. The two forms (old and new) enter a mutual unity of functionality and aesthetics.


The contrast between the two basically very different structures and styles is enhanced by the conscious differentiation of building and façade materials. The old building will be thermally renovated and given a classic, white, rough plaster exterior. The new building, on the other hand, is a lightweight construction erected mainly using prefabricated timber elements (with partial steel supports). The roof, the façades, and the various undersides and projecting roofs (such as the one covering the parking spaces) are coated in a special rubber sealing layer (COVERIT-NOVOtan k Grey EPDM). This innovative product, already proven on the market, dresses the building in elegant gray.


The two structures are bound together through the overriding functional concept, and the use of the same architectural surfaces throughout the interiors (flooring, walls, and ceilings) of both structures, as well as by the window and door installations. Polished and sealed industrial cast plaster flooring is suggested for the entrance, wet rooms, and utility spaces, while classic wooden floors could be used in the living areas. Walls and ceilings (with acoustic paneling where needed) will be finished in a matte white. Natural stonework could be added in certain places, such as around the upstairs open fireplace.


The old building will be refurbished and spatially and functionally adapted to achieve the maximum possible in modern living comfort. The existing stairway in the old house will be removed. This makes space for larger rooms, including a large bathroom on the ground floor that could be divided into two smaller baths if wished (master and children’s or guest bathrooms), a bedroom with a closet/dressing room, a cloakroom, and a hallway adjoining the new entrance/foyer to create an ample entranceway layout. A wellness area will be installed downstairs, with a relaxation or fitness room sauna, and a small bath. Service areas and a pantry will also be located here.


The new building, which completes and “triggers” the old building, houses all pathways: a broad stairway leads to the entrance on the new upper floor. Here, a living and dining area includes an open kitchen, an open fireplace, and a library. Floor-to-ceiling glass walls (by Skyframe) frame the view of Krems and the southern Krems Valley toward Göttweig Abbey. Two terraces extend east and south, and a sort of “turret” marks the end of the covered terrace and creates a very special outdoor place.


A side stairway is also housed in the new building, creating a direct connection between all three floors by leading from the top floor into the more private ground floor area, including the two newly built ground floor areas (nursery or guest room). The back vineyard can be reached from the new upper floor by crossing a bridge. It would also be possible to put in a pool here.

Project Credits
Product Spec Sheet

Products Behind Projects
Product Spotlight
News
Archello Awards 2024 – Early Bird submissions ending April 30th
26 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Introducing the Archello Podcast: the most visual architecture podcast in the world
26 Apr 2024 News
Introducing the Archello Podcast: the most visual architecture podcast in the world

Archello is thrilled to announce the launch of the Archello Podcast, a series of conversations featu... More

Tilburg University inaugurates the Marga Klompé building constructed from wood
26 Apr 2024 News
Tilburg University inaugurates the Marga Klompé building constructed from wood

The Marga Klompé building, designed by Powerhouse Company for Tilburg University in the Nethe... More

FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw
25 Apr 2024 News
FAAB proposes “green up” solution for Łukasiewicz Research Network Headquarters in Warsaw

Warsaw-based FAAB has developed a “green-up” solution for the construction of Łukasiewic... More

Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps
24 Apr 2024 News
Mole Architects and Invisible Studio complete sustainable, utilitarian building for Forest School Camps

Mole Architects and Invisible Studio have completed “The Big Roof”, a new low-carbon and... More

Key projects by NOA
24 Apr 2024 News
Key projects by NOA

NOA is a collective of architects and interior designers founded in 2011 by Stefan Rier and Lukas Ru... More

Taktik Design revamps sunken garden oasis in Montreal college
23 Apr 2024 News
Taktik Design revamps sunken garden oasis in Montreal college

At the heart of Montreal’s Collège de Maisonneuve, Montreal-based Taktik Design has com... More

Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel
23 Apr 2024 News
Carr’s “Coastal Compound” combines family beach house with the luxury of a boutique hotel

Melbourne-based architecture and interior design studio Carr has completed a coastal residence embed... More