Recently there have been misconceptions in some areas of the UK marketplace that certain ‘common solution’ alternatives for concrete-to-steel connections perform just as well as the Schöck Isokorb type KS14 thermal break element. This is not necessarily the case. As a specialist in this sector, Schöck demands extremely high product performance standards and has a strong professional interest in ensuring that alternative solutions comply with the necessary building regulations – and that any performance claims are verifiable.


To bring clarity to the situation, an independent investigation into the various performance criteria concerning the effectiveness of steel balcony connections to concrete slabs has been carried out by the Oxford Institute for Sustainable Development, at Oxford Brookes University. The ‘common solutions’ in question being the direct connection of balcony support brackets to a concrete floor slab using no form of thermal break; a solution using brackets in conjunction with a 10mm ‘thermal pad’; and a further connection solution using a thicker 20mm ‘thermal pad’ .


The OISD found the Isokorb type KS14 to be a superior thermal insulating element for connecting cantilevered steel components to reinforced concrete; while other comparable solutions failed to obtain the minimum amount of performance required by Part L of the Building regulations. The first step in the independent investigation process was to determine the heat loss, minimum surface temperature – and consequently the temperature factor (fRSI) – resulting from the use of Schöck Isokorb type KS14 thermal break units connecting a steel balcony to a concrete floor slab. The temperature factor (fRSi) is used in the UK to indicate condensation risk as described in BRE IP1/06, a document cited in Building Regulations Approved Documents Part L1 and L2.


Once established, this calculated performance (1) was then compared with that of the three structurally equivalent ‘common solutions’. The following results table presents the minimum surface temperatures and temperature factor (2) for the cases modelled, where the temperature factor used to indicate condensation risk (fRSI) must be greater than or equal to 0.75 for residential buildings.


It is quite clear that the Isokorb KS14 unit, with fRSi = 0.904, exceeds these values by some margin and will therefore meet the requirements of Building Regulations Approved Documents L1 and L2. Further, the results demonstrate that where no unit is used (fRSI =0.681) and also with the 10mm and 20mm pad connections (fRSI =0.713 and 0.706 respectively) – all three would fail against the criteria required for residential buildings.

Project Spotlight
News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert
18 Mar 2024 News
Nokha Village Community Centre by Sanjay Puri Architects is an architectural oasis in the desert

Mumbai-based Sanjay Puri Architects has completed the Nokha Village Community Centre, an architectur... More

Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024
15 Mar 2024 News
Square and Tourist Office: Emerging finalist in Mies van der Rohe Awards 2024

In this Archello series, we look at each of the seven nominated projects (five architecture finalist... More

25 best mosaic wall tile manufacturers
15 Mar 2024 Specification
25 best mosaic wall tile manufacturers

Mosaic wall tiles are produced in an enormous range of colors, shapes and finishes, and from a varie... More

Introducing Partner Motion Facades
15 Mar 2024 Partner News
Introducing Partner Motion Facades

Motion Facades specializes in supplying advanced facade systems for luxury real estate projects. Its... More

Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel
15 Mar 2024 Archello Awards
Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores join Archello Awards 2024 jury panel

Architects Bergendy Cooke, Grégoire Du Pasquier, Ruth Baleiko and Mathew Albores have been an... More

JSWD completes new office complex in Bonn unified by triangular facade elements
14 Mar 2024 News
JSWD completes new office complex in Bonn unified by triangular facade elements

International architectural firm JSWD has completed the Neuer Kanzlerplatz office complex in the cit... More

Archello Awards 2024 expands with 'Firm Awards'
14 Mar 2024 Archello Awards
Archello Awards 2024 expands with 'Firm Awards'

Today Archello introduces a new set of Firm Awards categories to widen the scope of the Archello Awa... More

Studio Egret West develops plans for new Passivhaus homes
13 Mar 2024 News
Studio Egret West develops plans for new Passivhaus homes

London-based multidisciplinary architecture and design practice Studio Egret West has developed plan... More