RDM Innovation Dock
Rob 't Hart

RDM Innovation Dock

SPEE architecten as architect

In the very heart of the Rotterdam City Ports area, RDM Campus has been established on the former premises of the Rotterdam Dry Dock Company (RDM). Under the motto Research, Design, Manufacturing this area has been redeveloped into a unique location and breeding-place for the creative and innovative production industry. Education and companies work together on sustainable and innovative solutions in the areas of building, mobility and energy.


The focus point of RDM Campus is the redeveloped former machinery hall; RDM Innovation Dock RDM Innovation Dock is a series of big-scale monumental industrial sheds with a floor area of 23,000m2 of which 12,500m2 is available for companies that would like to engage in knowledge sharing with the adjacent schools. This part of Innovation Dock is the so-called Business Hall. To facilitate these companies an urban grid with various infrastructures and parcel sizes was established, with maximum flexibility, optimal safety and a strong identity. The different circulation principles with paths in varying widths for pedestrians, fork-lift trucks and trucks form the basis of the design. Each parcel in the Business Hall will have a specific lay-out and set up depending on the requirements of the individual companies. The use and the organization principle are clearly anchored through the integrally designed signing plan on the floor with sign-posting, traffic rules, parcel boundaries and escape routes. The signing is executed in a ‘glow-in-the-dark’ or luminescent coating that makes the hall readable both in the day and nighttime. At the same time this coating takes care of energy saving and safety thereby reflecting the innovative character of the RDM Innovation Dock. In case of darkness, as a result the signing is still strongly visable through luminescent crystals. In this fashion parcel boundaries, zebra crossings, pictograms and sign-posting are indicated. The coating contributes to sustainability in terms of CO2 reduction. Because the material charges itself under influence of daylight and artificial lighting. Only when it gets dark the material lights up resulting in a lesser need for artificial lighting. By doing so the use of electricity decreases. The use of colour in the overall plan is reserved in order to promote the innovations of the separate companies and to respect the monumentality of the existing structure.


The various companies are able to organize their parcel to their own needs and wishes. To create uniformity and synergy PLUS architecten designed a catalogue with options for office and storage units as well as fences in which the number of glass openings, different lay-outs, stacked or solitary use are a few of the variables. The units are treated with an acoustic skin in order to enhance the overall acoustic qualities of the hall. By placing fences on the units these units become damage proof. The modular grid facilitates these elements that are all coated in the same industrial light gray colour of the parcels emphasizing the reserved approach of the architectonical intervention. The added facilities such as toilets, storage rooms and equipment rooms are all executed in black, both inside and outside supporting the reserved colour approach. In addition the outside walls of these facilities are executed in acoustic panels with a ‘glow in the dark’ signing.

RDM Innovation Dock

groosman as Architects

In the heart of the ports of Rotterdam, Groosman used a crane track in a former machine hall to suspend 1000 m2 of office space. The hall is situated on the terrain of RDM (Rotterdam Dry-dock Company), a former shipyard recently rebuilt into a campus for education and innovation. The Innovation Dock is in use by schools and small-scale and innovative companies operating in the markets “building, moving & powering”.


An urban shelving unit In order to achieve a logical system on the ground floor Groosman used a urban design like grid painted on the floor. Because of the enormous height a large part of the inner volume of the halls remained unused. Groosman launched the idea to add a second grid system on the level of 8 meters high, to double the usable surface of the halls. Several ways of use can be implemented within this technical framework and change of use can be easily realised. The plug-in system is extendable as well as dismountable. The floor underneath the added structure is used for production as well as events. Referring to the concept of a city inside a hall, a large photograph of a detailed satellite image of the port of Rotterdam was placed on the underside of the office.


The intermediate floor The idea of the shelving unit derived from the unused crane tracks, which demonstrated their carrying capacity before. The extra loading capacity is used to “hang” the new functions in the structure. The first unit, the intermediate floor with 1000 m² floor space, is accessed by an external staircase and elevator. These are connected to a system of gangways which lead to the several additional units. The units, designed as steel structures with light and flexible fill-ins, are attached to supporting beams in between the crane tracks. The suspended level coinciding with the existing construction is kept open, whereby voids are created. In doing so the structure is maximally exhibited and a reference to the former industrial use is assured.

Project Credits
Product Spec Sheet

Products Behind Projects
Product Spotlight
News
Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular
17 Apr 2024 News
Hudson Valley Residence by HGX Design draws inspiration from local agricultural vernacular

New York City-based creative studio HGX Design has completed the Hudson Valley Residence, a modern,... More

Key projects by Perkins&Will
17 Apr 2024 News
Key projects by Perkins&Will

Perkins&Will, a global interdisciplinary design practice, places architecture at its core. With... More

Archello Awards 2024 – Early Bird submissions ending April 30th
16 Apr 2024 News
Archello Awards 2024 – Early Bird submissions ending April 30th

The Archello Awards is an exhilarating and affordable global awards program celebrating the best arc... More

Albion Stone creates stone bricks from “unloved” stone
15 Apr 2024 Innovations
Albion Stone creates stone bricks from “unloved” stone

A stone brick is a sustainable building material made using stone blocks and slabs that do not meet... More

25 best engineered wood flooring manufacturers
15 Apr 2024 Specification
25 best engineered wood flooring manufacturers

Engineered wood flooring is a versatile building product that offers several advantages over traditi... More

Austin Maynard Architects designs a “pretty” wellness-enhancing home in Melbourne
12 Apr 2024 News
Austin Maynard Architects designs a “pretty” wellness-enhancing home in Melbourne

Australian architectural studio Austin Maynard Architects recently completed a new two-story house i... More

Ædifica completes residential development in Montreal emphasizing densification, sustainability, and quality of life
11 Apr 2024 News
Ædifica completes residential development in Montreal emphasizing densification, sustainability, and quality of life

Montreal-based architectural practice Ædifica has completed Cité Angus II, the second p... More

Knox Bhavan reimagines challenging London brownfield site as contemporary low-carbon home
10 Apr 2024 News
Knox Bhavan reimagines challenging London brownfield site as contemporary low-carbon home

London-based architectural practice Knox Bhavan designed Threefold House, a new residential property... More